Most viewed |
100822 628570 viewsWOE type iron ore waggon WOE 33526 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-066 and fleet number 9014 for Koolyanobbing iron ore operations, on empty train 1416 at Hampton, 22nd August 2010.
|
|
100822 629570 viewsWOE type iron ore waggon WOE 33311 is one of a batch of one hundred and forty one built by United Goninan WA between November 2005 and April 2006 with serial number 950142-016 and fleet number 810 for Koolyanobbing iron ore operations, on empty train 1416 at Hampton, 22nd August 2010.
|
|
060111 226570 viewsTooligie, empty grain train running north behind ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004. 11th January 2006.
|
|
060111 228770 viewsMurdinga, empty grain train running through the station with the grain silos and loadout spout. 11th January 2006.
|
|
060111 231470 viewsNantuma, Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo units 850 and 905 as they round the bend just north of the old station site at the 183 km. Their next shunt will be Warramboo. 11th January 2006.
|
|
060113 250870 viewsKevin, cab side view of 1604 a Clyde Engineering built EMD JL22C model serial 71-731, originally coded NJ class NJ 4 and built for the Central Australia Railway in 1971, transferred to the Eyre Peninsula in 1981 arrives with empty gypsum train 6DD3. 13th January 2006.
|
|
130703 014670 viewsMurdinga, HCN type bogie grain hopper waggon HCN 11, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.
|
|
130703 015670 viewsMurdinga, Genesee & Wyoming locomotive AE Goodwin ALCo model DL531 unit 859 'City of Port Lincoln' serial 84705, built in 1963, 859 started life at Peterborough, spent some years in Tasmania and even spent time in Perth on standard gauge before being transferred to the Eyre Peninsula system in 2003. Geo location. 3rd July 2013.
|
|
130703 016570 viewsMurdinga, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of two originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513, fitted with dynamic brakes, started working on the Eyre Peninsula in November 2004.
|
|
130703 016770 viewsMurdinga, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of two originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513, fitted with dynamic brakes, started working on the Eyre Peninsula in November 2004.
|
|
130703 019570 viewsTooligie, overview of the four cell concrete grain silo complex with the loading spout. Geo location. 3rd July 2013.
|
|
130703 020570 viewsTooligie, HAN type bogie grain hopper waggon HAN 36, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN class for the Eyre Peninsula system.
|
|
130703 025970 viewsKaldow, running south with the sun behind it is 1200 class 1204 a Clyde Engineering built EMD G12C model with serial 65-428 leading two ALCo units and was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513. It came to the Eyre Peninsula in October 2004. Geo location. 3rd July 2013.
|
|
130703 029770 viewsKaldow, HAN type bogie grain hopper waggon HAN 67, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|
130703 029870 viewsKaldow, HBN type dual use ballast / grain hopper waggons, HBN 4 still with side gangways in place. One of seventeen built by South Australian Railways Islington Workshops in 1968 with a 25 ton capacity, increased to 34 tons in 1974. HBN 1-11 fitted with removable tops and roll-top hatches in 1999-2000.
|
|
130704 039870 viewsKyancutta, HBN type dual use ballast / grain hopper waggons, HBN 8 with side gangways removed. One of seventeen built by South Australian Railways Islington Workshops in 1968 with a 25 ton capacity, increased to 34 tons in 1974. HBN 1-11 fitted with removable tops and roll-top hatches in 1999-2000.
|
|
130704 040770 viewsKyancutta, south bound loaded grain train has stopped here to collect a loaded rack of grain waggons, the second driver has just restored the points for the mainline as the train waits across the Eyre Highway grade crossing and one of only three electric signals on the network, behind EMD 1204 and twin ALCo 830 units 873 and 851. 4th July 2013.
|
|
130704 045170 viewsKyancutta, as the train powers away south two examples of the SAR built HAN type of bogie grain waggons lead the front of the rake, sixty eight units were built by South Australian Railways Islington Workshops between 1969 and 1973 for the Eyre Peninsula system with the third waggon being an HCN type converted by SAR Islington Workshops between 1978-79 from Tulloch Ltd NSW built NHB type iron ore waggons. 4th July 2013.
|
|
130704 046170 viewsKyancutta, HAN type bogie grain hopper waggon HAN 23, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|
130704 048770 viewsMoule, looking east, Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. From the left is the end of the ballast siding with the crossing loop rejoining the mainline just before the grade crossing to access the ballast stockpile area. Location is here. 4th July 2013.
|
|
16480 files on 824 page(s) |
|
|
|
|
|
|
|
|
659 | |
|
|
|
|
|
|
|