Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
150522_8193.jpg
150522 8193269 viewsWedgefield, Sims Metal yard, Goninan WA rebuild CM40-8M units 5659 serial 8412-04/94-150, 5640 serial no. 8281-05/92-129 and 5638 serial 8281-02/92-127 await the shears. Full details of these units can be seen here .
16948.jpg
16948269 viewsBassendean, the rear of Goninan's workshops, Mt Newman Mining's AE Goodwin built ALCo M636 unit 5480 serial G6061-1 being prepped for rebuilding into 5658. October 1993.
Jim Bisdee photo.
135-11.jpg
135-11268 views2400 class QR locos 2503 and 2500 with a loaded coal train, near Ipswich.
195-10.jpg
195-10268 viewsWittenoom, top of Bee Gorge, snappy gums and ant hills.
193-12.jpg
193-12268 viewsMoodlu Quarry line curving around to the left with catch point and disc, the line on the right is curving towards Moodlu station site.
200-11.jpg
200-11268 viewsMoorine Rock, Australian National AN class AN 6 a Clyde Engineering built EMD model JT46C serial 93-1302, cab side view sits on the mainline with a Perth bound freight, 1500 hrs 22nd June 1997.
208-1-16.jpg
208-1-16268 viewsBassendean, looking towards Perth as a diesel electric multiple unit ADA class ADA 761 runs a two car Midland bound service.
211-17.jpg
211-17268 viewsEast Weipa Mine Centre, Komatsu HD1400.
217-19.jpg
217-19268 viewsDry Creek Motive Power Centre, Australian National's and the final Clyde Engineering EMD model AT26C Bulldog ever built as CL class CL 17 'William McMahon' serial 71-757.
030414_154516.jpg
030414 154516268 viewsPenong , goods loop off to the left, grain loop on the right in the grass. Concrete silo block 2 with newer Ascom style complex behind that as Block 1.
150505_7942.jpg
150505 7942268 viewsFMG Solomon Line, looking east, earth fill abutment embankment for rail line, Jingarri Creek, expanded view from 7940, shows access road. Geodata: -22.0545750 118.7278517 .
150523_8201.jpg
150523 8201268 viewsNelson Point Yard, parked beside the Locomotive Service Shop, BHP Billiton diesel fuel tank waggon 0035 with safety slogan 'Take time to work safety', total capacity of 117 m3 for a nominal capacity of 113 m3 built in China by CNR - QRRS.
160525_4945.jpg
160525 4945268 viewsWest Kalgoorlie, Aurizon intermodal train 2MP1. Coupling between second unit locomotive and the inline fuelling waggon QQFY 4271, shows the MU or Multiple Unit red cable going into the socket with the cream cap on the waggon and the red cap on the loco, behind that is the crimp fitting is the in-line fuel hose between waggon and the loco along with train air pipe and coupling.
180616_1791.jpg
180616 1791268 viewsAt the 81 km, loaded Bradken China built B series 'master' waggon 20238 with 'slave' waggon 25238, build date April 2013, leading and setup as an instrumented ore waggon, the solar panels are for charging the instrument batteries.
107-17.jpg
107-17267 viewsEchuca turntable deck and pit, looking south.
112-18.jpg
112-18267 viewsNorth Geelong C Box, V/Line broad gauge G class G 534 Clyde Engineering EMD model JT26C-2SS serial 88-1264 leads sister G class across Separation Street with an empty grain train departing, point rodding in foreground.
187-15.jpg
187-15267 viewsMonkland, Gympie Queensland. View looking east into the lower yard, overgrown. Molasses tanks in upper yard at unloading siding. GeoData.
195-34.jpg
195-34267 viewsWittenoom Gorge, Australian Blue Asbestos or ABA Colonial Mill, overview from the drier level looking down on the mills and dust collectors.
196-03.jpg
196-03267 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C unit 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
209-04.jpg
209-04267 viewsEast Perth Passenger Terminal, Westrail L class L 272 Clyde Engineering EMD model GT26C serial 69-621 shunts the car carrying waggons into the unloading dock off the Indian Pacific.
16608 files on 831 page(s) 68

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional