Most viewed |

050518 2161333 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 502, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

050518 2160333 viewsBing Siding. Side view of 1963 built Magor USA waggon 529, originally in ore service before conversion to a ballast waggon.
|
|

050518 2203333 viewsBing Siding, view of number plate and original markings on ballast waggon 519.
|
|

051001 5741333 viewsBoodarie, the Steel Train or rail recovery and transport train, cut down by Mt Newman Mining workshops, a Magor USA built former Oroville Dam 91 ton ore waggon 665, seen here being used as the crib waggon on the end of the steel train.
|
|

060429 3755333 viewsFlash Butt yard, Pony re-laying waggon 6704 special flat waggon on the left coupled to a former Goldsworthy Mining 55 tonnes flat waggon built by Tomlinson Steel from 1966.
|
|

060501 3901333 viewsTabba Siding, originally built by Difco USA for Goldsworthy Mining Ltd in 1967 as a batch of five, prefixed with 870 in BHP service, 8704 side dump waggon loaded with ballast.
|
|

060713 6549333 viewsBoodarie Yard, modified original Magor USA built Oroville waggon 594, cut down and covered and in use as indexing waggons on the front of each rake for Finucane Island car dumpers, note the original ODCX marking visible.
|
|

060721 7335333 viewsBing Siding, rail recovery and transport train flat waggon rear lead off waggon 6203, built by Comeng WA in January 1977. The AC6000 loco on the rear has a pulled coupler and is being towed to Hedland.
|
|

050414 0939333 viewsFlash Butt yard, builders plate of Barclay Mowlem track tamper a Fairmont Jackson model 6700 tamper serial 153172. 14th April 2005.
|
|

050625 3817333 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, a Barclay Mowlem track lifter track machine off clear of the running lines. 25th June 2005.
|
|

060811 8013333 viewsGarden Siding, Speno rail grinder RG 2 coupled with RG 1 in the passing track. 11th August 2006.
|
|

100717 0696333 viewsFlash Butt yard, new rail stock carrier waggon 6027, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

141124 7078333 viewsRio Tinto compressor waggon set leader CB 01, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons. Seen here at Parker Point, Dampier on 24th November 2014.
|
|

241-32333 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as three loaded ore rakes behind a pair of CM40-8M units on each wait their turn through the dumper to discharge. June 2002.
|
|

190109 1662333 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00115 built by CSR Yangtze Co China serial 2014/382-115 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

080124 1633333 viewsChapman Siding, detail of the bar coupling arrangement showing bar, the large hose is the through brake pipe and the small hose the control pipe for the slave waggon. 24th January 2008.
|
|

110620 2279333 viewsChapman, FMG TK type fuel tank waggon TK 07 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as part of an order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
|
|

243-31333 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
|
|

250-15333 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind the standard pairing of two General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 stand on the loop or passing track for a meet with a loaded train. 1550 hrs 21st October 2000.
|
|

252-33333 viewsPort Hedland at 12 Mile Creek a loaded Yarrie train crosses over the creek behind Goninan CM40-8M GE rebuild unit 5645 'Sherlock' serial number 8281-11 / 92-134. Early December 2001.
|
|
| 19087 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
683 |  |
 |
 |
 |
 |
 |
 |
|