Most viewed |

051001 5673404 viewsFlash Butt yard, Jackson model 6700 tamper serial 153246 lettered for Railway Equipment Leasing And Maintenance RELAM Inc undergoing delivery checks view of the light buggy and rods. 1st October 2005.
|
|

6033 Gemco WA 100717 0681404 viewsFlash Butt yard, new rail stock carrier waggon 6033, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

6027 Gemco WA 100717 0695404 viewsFlash Butt yard, new rail stock carrier waggon 6027, built by Gemco Rail in late 2009-10 as these waggons have Barber bogies and not Chinese castings, view of B end and handbrake and rail string support.
|
|

0005 Comeng NSW 110411 09989404 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0005 one of six such tank waggons built in 1970-71.
|
|

241-28404 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as three loaded ore rakes behind a pair of CM40-8M units on each wait their turn through the dumper to discharge. June 2002.
|
|

241-30404 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as three loaded ore rakes behind a pair of CM40-8M units on each wait their turn through the dumper to discharge. June 2002.
|
|

190107 0527404 viewsBinduli, following a crew change Mineral Resources empty iron ore train 2034 with Mineral Resources MRL class loco MRL 003 'Southern Cross' with serial R-0113-03/14-506 a UGL Rail Broadmeadow NSW built GE model C44ACi model leads two Pacific National NR class units NR 43 and NR 78 with 53 pairs of MHPYs and 2 single MHLY bottom discharge hopper waggons for 1293 metres and 2258 tonnes.
|
|

246-35404 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline behind the standard quad Dash 8 power with 202 waggons which are a mix of builds from Nippon Sharyo Japan and Tomlinson Steel and Centurion Industries both WA companies. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. The newly extended roads can be seen either side of the train and in the distance can be seen are the railway workshops. 22nd May 2002.
|
|

249-25404 viewsFortescue River Bridge on the Robe River line at the 115.8 km in flood looking upstream to the east from the middle of the bridge following Cyclone John on 18th December 1999. Approximate location.
|
|

252-27404 viewsAbydos area, known as the China Wall or London Wall.
|
|

256-20404 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
|
|

257-03404 viewsFlash Butt yard BHP's stored Goninan WA ALCo C636 to GE C36-7M rebuild unit 5507 awaits its fate. Rebuilt in 1987 at Goninan's Welshpool factory from a 1970 AE Goodwin built ALCo C636 with serial number G6035-2 and road number 5461 and assigned new serial number 4839-03 / 87-072. It was delivered in Mount Newman Mining orange and was named Port Hedland. Late 2001.
|
|

257-25404 viewsGoldsworthy Junction, an empty train runs between the junction and the Broome Rd crossing behind the standard single locomotive 5646 'White Springs', a Goninan 1992 built GE CM40-8 model with serial number 5244-11 / 92-135. The four styles of waggon in use are visible, behind the loco are three Golynx waggons, then a number of Gunderson USA builds, the ribbed type is a Portec USA built and then following are the Tomlinson WA and Scotts of Ipswich built 70 ton waggons. Late 2001.
|
|

257-32404 viewsGoldsworthy Junction, empty train with second unit BHP Iron Ore loco 5632 'Poseidon' one of four new built GE CM39-8 model locomotives by Goninan in late 1998 with serial number 5831-11 / 88-081.
|
|

190129 4276404 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00159 built by CSR Yangtze Co China serial 2014/382-159 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

140601 4631404 viewsMidland, loaded iron ore train #1030 heading to Kwinana, CFCLA leased CHEY type waggon CHEY 8043 one pair of 120 bar coupled pairs built by Bluebird Rail Operations SA in 2011-12. 1st June 2014.
|
|

140601 4682404 viewsMidland, loaded iron ore train #1030 heading to Kwinana, CFCLA leased CHCH type waggon CHCH 7673 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
|
|

267-02404 viewsGoldsworthy Junction, BHP's 1230 empty departure behind General Electric AC6000 unit 6076 'Mt Goldsworthy' serial number 51068 leads CM40-8MEFI 5669 on the point with mid-train units CM40-8M units 5651 and 5645 104 waggons back with 104 waggons trailing. 1247 hrs 12th of April 2002.
|
|

268-05404 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|

269-07404 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|
| 19220 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
683 |  |
 |
 |
 |
 |
 |
 |
|