Most viewed |

130703 0298335 viewsKaldow, HBN type dual use ballast / grain hopper waggons, HBN 4 still with side gangways in place. One of seventeen built by South Australian Railways Islington Workshops in 1968 with a 25 ton capacity, increased to 34 tons in 1974. HBN 1-11 fitted with removable tops and roll-top hatches in 1999-2000.
|
|

130704 0437335 viewsKyancutta, 1200 class unit 1204 wearing current owner Genesee & Wyoming livery is a Clyde Engineering built EMD G12C model with serial 65-428 was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1514 recoded to 1204 in April 2004 and to the Eyre Peninsula in July 2004.
|
|

130705 0606335 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.
|
|

130705 0609335 viewsLock, up end looking down through Lock, Ascom silo block #5 on the left, Viterra fast loader loading train while loaded portion sits on the mainline.
|
|

130705 0653335 viewsLock, 1203, 846 and 859 shunt back into the yard with the second loaded portion, HAN type bogie grain hopper waggon HAN 59, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130708 0757335 viewsCharra, originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 58 X, without hungry boards loaded with gypsum, Charoban Rd grade crossing, 477.8 km.
|
|

130708 0787335 viewsCharra, crossing loop, 466.2 km.
|
|

130708 0877335 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.
|
|

130708 0891335 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 33 Q, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
|
|

130708 0921335 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 57, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
|
|

130708 0934335 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 8, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
|
|

100611 0322335 viewsMidland, AQHY 30037 with sulphuric acid tank CSA 0060, originally built by the WAGR Midland Workshops in 1964/66 at WF type flat waggons, then following several codes and modifications in 1997 seventy five were converted to WQH to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana.
|
|

100731 3231335 viewsBinduli, AQHY 30037 with sulphuric acid tank CSA 0060, originally built by the WAGR Midland Workshops in 1964/66 at WF type flat waggons, then following several codes and modifications in 1997 seventy five were converted to WQH to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana.
|
|

226-21335 viewsShaw siding back track at the 219 km, Speno RR 24 M-1 rail grinder stabled in back track. GeoData.
|
|

227-11335 viewsPort Hedland harbour control tower, the salt conveyor is at the bottom of the picture, the high building beyond the tower is the Esplanade Hotel, with the two story building to the right of the tower the Port Authority offices. GeoData.
|
|

227-20335 views30 km area on the Newman mainline, east of the original Quarry 1, an empty train powers along the gentle .17% rising grade behind a pair of Goninan CM40-8M GE rebuild units and an General Electric AC6000. GeoData.
|
|

231-27335 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
|
|

233-07335 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

235-24335 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5639 'Corunna Downs' serial 8281-03 / 92-128 sits on a loaded train as second unit awaiting departure time. Note the unit has no marker lights and the tank tells it was an AE Goodwin built C636 ALCo before rebuild.
|
|

236-20335 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's General Electric built AC6000 unit 6076 'Mt Goldsworthy' serial 51068 sits out the front with new windscreen protectors or 'blinkers' fitted.
|
|
| 19087 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
683 |  |
 |
 |
 |
 |
 |
 |
|