Most viewed |

8704 Difco USA 040810 145555383 viewsShaw Siding backtrack, view looking south with Quarry 8 track leading off to the right, a line up of Difco Ohio USA built side dump waggons, a combination of both Mt Newman long and short versions and Goldsworthy Mining short version no. 4 closest to camera.
|
|

CHRY 760 050518 2102383 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 760.
|
|

CHRY 753 050518 2136383 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 753, defect card holder.
|
|

0515 Magor USA 050518 2175383 viewsBing Siding. Side view of 1963 built Magor USA waggon 515, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

6208 Comeng WA 051001 5710383 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #23, 6208, a Comeng WA built flat waggon from February 1977 under order no. 07-M-282 RY.
|
|

6201 Comeng WA 051001 5736383 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #28, 2nd lead off waggon 6201, built by Comeng WA in January 1977 under order no. 07-M-282 RY, with the Gemco built straddle crane.
|
|

6012 Scotts of Ipswich Qld 050522 2728383 viewsGoldsworthy Junction, rail recovery and transport train flat waggon #18, 6012, built by Scotts of Ipswich Qld in September 1970.
|
|

6203 Comeng WA 080621 2721383 viewsTabba South, rail recovery and transport train flat waggon #1, rear lead off waggon 6203, built by Comeng WA in January 1977. The straddle crane is a newish unit built by Vaia Car model no. TCR-V and the four wheels are chain driven, replacing the original Gemco hydraulic unit.
|
|

0710 CNR - QRRS China 150619 9080383 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0710 loaded with fines for sheeting, A end and bogie detail.
|
|

190109 1585383 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00271 built by CSR Yangtze Co China serial 2014/382-271 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

243-19383 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|

249-24383 viewsFortescue River Bridge on the Robe River line at the 115.8 km in flood looking downstream to the west from the middle of the bridge following Cyclone John on 18th December 1999. Approximate location.
|
|

190129 4248383 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00061 built by CSR Yangtze Co China serial 2014/382-61 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190129 4267383 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00224 built by CSR Yangtze Co China serial 2014/382-224 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

140601 4478383 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHCH type waggon CHCH 7603 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
|
|

267-11383 viewsGoldsworthy Junction, BHP's 1230 empty departure mid-train units Goninan rebuild CM40-8M GE units 5651 'Tobata' serial number 8412-08 / 93-142 and 5645 'Sherlock' serial number 8281-11 / 92-134 104 waggons from the lead with 104 waggons trailing. The line curving away to the left is the Goldsworthy line to Boodarie and Finucane Island. 1247 hrs Friday 12th of April 2002.
|
|

160710 iPh5S 2806383 viewsWittenoom Gorge, Colonial Mine, reverse view from 2802, looking north across the level of the western wall. Old track points or switches stacked up. Geodata.
|
|

140406 IMG 1940383 viewsWest Kalgoorlie, NTBF 6119 fuel tank waggon, originally built by Comeng NSW in 1975 as SCA type SCA 270 a 69,000 litre bitumen tank waggon for Shell NSW, diesel capacity of 62,700 litres. Peter Donaghy image.
|
|

190108 1117383 viewsWest Kalgoorlie, ATKY type fuel tank waggon ATKY 516 built by Tulloch Ltd NSW in 1971 as WJK type 93,000 litre, three compartment, three dome tank along with sister WJK 515 for BP Oil. Recoded to WJKY. Gemco refurbished 09-16. Maximum capacity 101,000 litres, safe fill 74,000 litres.
|
|

190108 1279383 viewsWest Kalgoorlie, NTAY type fuel tank waggon NTAY 3359 with 65,000 litre capacity for Caltex. Refurbished by Gemco WA in Nov 2013 from a Caltex NTAF type tank waggon NTAF 359 originally built by Comeng NSW in 1975 as a CTX type CTX 359. Shows B end.
|
|
| 19215 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
693 |  |
 |
 |
 |
 |
 |
 |
|