Most viewed |

050625 3816384 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, a Barclay Mowlem sleeper inserter track machine off clear of the running lines. 25th June 2005.
|
|

060501 3913384 viewsAbydos Siding backtrack, Speno rail grinder RG 2, third grinding module and driving cab. 1st May 2006.
|
|

060501 3917384 viewsAbydos Siding backtrack, Speno rail grinder RG 1, a RR24 model grinder with 24 grinding wheels, serial M20. 1st May 2006.
|
|

6102 Mt Newman Mining Workshops 080621 2717384 viewsTabba South, one of a batch of six flat waggons converted by Mt Newman Mining workshops by cutting down a pair of ore waggons to make one flat waggon, 6102 in service with the rail recovery and transport train as waggon #5.
|
|

6203 Comeng WA 080621 2721384 viewsTabba South, rail recovery and transport train flat waggon #1, rear lead off waggon 6203, built by Comeng WA in January 1977. The straddle crane is a newish unit built by Vaia Car model no. TCR-V and the four wheels are chain driven, replacing the original Gemco hydraulic unit.
|
|

6016 Comeng WA 110619 1887384 viewsSouth of Mooka Siding, the Steel Train or rail recovery and transport train, flat waggon #17, 6016 with registered number 6506-016, a Comeng WA built flat waggon from 1971.
|
|

0026 CNR - QRRS China 150314 7749384 viewsBing Siding, empty 116 kL CNR-QRRS of China built tank waggons 0026 and 0027, both A ends, both from a batch of ten built in 2014.
|
|

0706 CNR - QRRS China 150619 9086384 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0706 loaded with fines for sheeting.
|
|

190109 1585384 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00271 built by CSR Yangtze Co China serial 2014/382-271 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

243-19384 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|

243-21384 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
|
|

190129 4259384 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00326 built by CSR Yangtze Co China serial 2014/382-326 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190129 4319384 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00251 built by CSR Yangtze Co China serial 2014/382-251 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190129 4322384 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00080 built by CSR Yangtze Co China serial 2014/382-80 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

140601 4473384 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHCH type waggon CHCH 7675 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
|
|

140601 4478384 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHCH type waggon CHCH 7603 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
|
|

140601 4623384 viewsMidland, loaded iron ore train #1030 heading to Kwinana, CFCLA leased CHEY type waggon CHEY 8041 one pair of 120 bar coupled pairs built by Bluebird Rail Operations SA in 2011-12. 1st June 2014.
|
|

267-11384 viewsGoldsworthy Junction, BHP's 1230 empty departure mid-train units Goninan rebuild CM40-8M GE units 5651 'Tobata' serial number 8412-08 / 93-142 and 5645 'Sherlock' serial number 8281-11 / 92-134 104 waggons from the lead with 104 waggons trailing. The line curving away to the left is the Goldsworthy line to Boodarie and Finucane Island. 1247 hrs Friday 12th of April 2002.
|
|

268-15384 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|

160710 iPh5S 2807384 viewsWittenoom Gorge, Colonial Mine, old underground 'jumbo' box for power distribution to electric pumps and drills. Jumbo is a modern mining term, so these would have been called something else…
|
|
| 19216 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
697 |  |
 |
 |
 |
 |
 |
 |
|