Most viewed |

100822 6214295 viewsWOE type iron ore waggon WOE 33429 is one of a batch of one hundred and forty one built by United Group Rail WA between November 2005 and April 2006 with serial number 950142-134 and fleet number 8928 for Koolyanobbing iron ore operations, on empty train 1416 at Hampton, 22nd August 2010.
|
|

100822 6252295 viewsWOE type iron ore waggon WOE 33525 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-065 and fleet number 9038 for Koolyanobbing iron ore operations, on empty train 1416 at Hampton, 22nd August 2010.
|
|

100822 6261295 viewsWOA type iron ore waggon WOA 31339 is one of a batch of thirty nine built by WAGR Midland Workshops between 1970 and 1971 with fleet number 217 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, on empty train 1416 at Hampton, 22nd August 2010.
|
|

100822 6269295 viewsWOD type iron ore waggon WOD 31324 is one of a batch of sixty two built by Goninan WA between April and August 2000 with serial number 950086-012 and fleet number 502 for Koolyanobbing iron ore operations with a 75 ton capacity and a replacement for a WO type waggon number, for Portman Mining to cart their Koolyanobbing iron ore to Esperance, on empty train 1416 at Hampton, 22nd August 2010.
|
|

100822 6306295 viewsWOE type iron ore waggon WOE 33340 is one of a batch of one hundred and forty one built by United Goninan WA between November 2005 and April 2006 with serial number 950142-045 and fleet number 839 for Koolyanobbing iron ore operations, on empty train 1416 at Hampton, 22nd August 2010.
|
|

060113 2474295 viewsThevenard, narrow gauge loco 1604 departs the yard with empty train 6DD3, 1604 leads a triple consist of Clyde Engineering built EMD JL22C model 1600 / NJ class combination of 1604 serial 71-731 and originally NJ 4, NJ 3 serial 71-730 and 1601 serial 71-728 the original class leader NJ 1, all three units started on the Central Australia Railway in 1971 and were transferred to the Eyre Peninsula in 1981. 1604 and 1601 both renumbered in 2004. 13th January 2006.
|
|

060113 2525295 viewsKevin, empty train 6DD3 is heading onto the south leg and original gypsum loading siding to continue the reversing process. 13th January 2006.
|
|

130703 0182295 viewsTooligie, a rake of loaded grain waggons of the HAN, HBN and HCN types awaits collection for the trip to Port Lincoln. 3rd July 2013.
|
|

130703 0191295 viewsTooligie, view of Ascom Jumbo silo complex with the elevator structure and covers over the dual truck unloading grates. 3rd July 2013.
|
|

130703 0268295 viewsKaldow, HAN type bogie grain hopper waggon HAN 12, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130703 0298295 viewsKaldow, HBN type dual use ballast / grain hopper waggons, HBN 4 still with side gangways in place. One of seventeen built by South Australian Railways Islington Workshops in 1968 with a 25 ton capacity, increased to 34 tons in 1974. HBN 1-11 fitted with removable tops and roll-top hatches in 1999-2000.
|
|

130704 0392295 viewsKyancutta, HCN type bogie grain hopper waggon HCN 13, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.
|
|

130704 0437295 viewsKyancutta, 1200 class unit 1204 wearing current owner Genesee & Wyoming livery is a Clyde Engineering built EMD G12C model with serial 65-428 was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1514 recoded to 1204 in April 2004 and to the Eyre Peninsula in July 2004.
|
|

130704 0456295 viewsKyancutta, HAN type bogie grain hopper waggon HAN 17, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130704 0493295 viewsMoule, yard view looking east from the points for the single ended ballast siding with ballast pile of the left. Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. It hosts a crossing loop and ballast loading siding, Location is here. 4th July 2013.
|
|

130704 0498295 viewsMoule, view of the General Railway Signal Company point lever and indicator at the western end of the crossing loop. Location here, 4th July 2013.
|
|

130705 0588295 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1.
|
|

130708 0793295 viewsCharra, crossing loop, 466.2 km.
|
|

130708 0852295 viewsPenong Junction, [url=https://goo.gl/maps/45FyW] located at the 429.7 km[url].
|
|

130708 0914295 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 4, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
|
|
| 19085 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
700 |  |
 |
 |
 |
 |
 |
 |
|