Most viewed |

233-14237 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

234-15237 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View of right hand side leading bogie. Circa 1998.
|
|

236-10237 viewsNelson Point, Loco Overhaul Shop, BHP AC6000 class locomotive 6072 'Hesta', a General Electric built AC6000 model, serial 51064, seen here in the shed having the windscreen protectors or 'blinkers' fitted.
|
|

060110 2176237 viewsNear the 73 km and Cockaleechie Road grade crossing, empty grain train with ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of image.
|
|

060110 2206237 viewsYeelanna, ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 shunts back onto its train of empties on the mainline as the second person prepares to re-join the train, a rake of waggons in grain siding await loading. Approx. location of image.
|
|

160523 3341237 viewsWest Kalgoorlie, AQHY 30110 with CSA 0118, originally built by the WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth. CSA 0118 was built by Vcare Engineering, India for Access Petrotec & Mining Solutions in 2015.
|
|

160523 3342237 viewsWest Kalgoorlie, AQHY 30090 with CSA 0092, originally built by the WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth. CSA 0092 was built by Vcare Engineering, India for Access Petrotec & Mining Solutions in 2015.
|
|

160525 4830237 viewsWest Kalgoorlie, ATHY 522 fuel tanker, one of two built by Comeng NSW in 1971 for Caltex as WJH type. With a capacity of 103000 litres but a safe full level of on 72000 litres.
|
|

160523 3617237 viewsWest Kalgoorlie, AQHY 30039 with sulphuric acid tank CSA 0110, originally built by WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana, part of loaded acid train 2406 arriving back in the yard. CSA 0110 was built by Vcare Engineering, India for Access Petrotec & Mining Solutions in 2015.
|
|

161112 3454237 viewsBinduli, loaded Hampton acid train 7406 with AQHY 30056 with sulphuric acid tank CSA 0083, originally built by the WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana. CSA 0083 was built by Acid Plant Management Services, WA.
|
|

050518 2088237 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 754.
|
|

050704 3998237 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0014 from 1974-5, one of six such tank waggons, empty tank waggons transported back to Port Hedland from Newman on the rear of loaded ore trains.
|
|

051001 5626237 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of handbrake end, pushed into earth bund.
|
|

051001 5682237 viewsBoodarie, the Steel Train or rail recovery and transport train holds the main towards Finucane Island, a loaded rake of Comeng WA and Scotts of Ipswich Qld flat waggons make up the consist.
|
|

051001 5705237 viewsBoodarie, the Steel Train or rail recovery and transport train, builders plate detail of flat waggon #20, 6010, a Scotts of Ipswich Qld built flat waggon on 03-09-1970.
|
|

051001 5735237 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #22, 6213, builders plate detail, a Comeng WA built flat waggon in February 1977 under order no. 07-M-282 RY.
|
|

050409 0412237 viewsShell Swagman Roadhouse, Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480 view of tamper frame and mechanism. 9th April 2005.
|
|

050421 1611237 viewsHesta Siding backtrack, Speno Australia's 24 stone rail grinder before they had id stickers fitted, this front unit was later stickered as RG 2. 21st April 2005.
|
|

050625 3661237 viewsMooka North, BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480 in out on the passing track, view of the tamping heads and mechanism. 25th June 2005.
|
|

050625 3819237 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, a Barclay Mowlem sleeper inserter track machine off clear of the running lines. 25th June 2005.
|
|
18740 files on 937 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
704 |  |
 |
 |
 |
 |
 |
 |
|