Most viewed |

050319 0140366 viewsNelson Point, cut down Magor USA built former Oroville Dam 91 ton ore waggon 665, now used as the crib waggon on the steel train, 3/4 view.
|
|

050412 0759366 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA ballast waggon 520.
|
|

050704 3986366 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0013 from 1974-5, one of six such tank waggons.
|
|

051001 5710366 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #23, 6208, a Comeng WA built flat waggon from February 1977 under order no. 07-M-282 RY.
|
|

050724 4213366 viewsNelson Point yard, Comeng NSW built 82 kilolitre water tank waggon 0001, one of two such tank waggons built in November 1970, attached to the Pony as they relay a road in the yard.
|
|

050724 4306366 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0017 from 1974-5, one of six such tank waggons.
|
|

050407 0383366 viewsNelson Point yard hard stand area sees brand new having only been delivered, BHP track tamper support trailer for Tamper 3 which will arrive in a couple of days. Plasser Australia 09-3X model with serial M480. 7th April 2005.
|
|

060501 3908366 viewsAbydos Siding backtrack, Speno rail grinders RG 2 coupled to RG 1. 1st May 2006.
|
|

171121 0970366 viewsBarker Siding, Loram rail grinder MPC 2, this was sent out from the USA where it was operational as LMIX 602 for Loram. The generator and driving cab look to be fitted to an 85 foot piggy back waggon. 21st November 2017.
|
|

190107 0583366 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00319 built by CSR Yangtze Co China serial 2014/382-319 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

246-08366 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
|
|

249-15366 viewsTable Hill on the Robe River railway line, a microwave radio communications site powered by solar panels. Approximate location.
|
|

249-24366 viewsFortescue River Bridge on the Robe River line at the 115.8 km in flood looking downstream to the west from the middle of the bridge following Cyclone John on 18th December 1999. Approximate location.
|
|

255-21366 viewsWestern Creek, looking south alongside the Hamersley Iron Dampier to Tom Price line on the right with the new Robe River interconnecting line on the left as both lines pass under the Robe River Cape Lambert to Deepdale line bridge. Geodata location here. May 2002.
|
|

245-32366 viewsMinnipa looking in the down direction along the mainline across Burgoyne Terrace towards Poochera with goods siding #2 points and switch stand. 7th April, 2003.
|
|

190129 4244366 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00064 built by CSR Yangtze Co China serial 2014/382-64 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190129 4326366 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00286 built by CSR Yangtze Co China serial 2014/382-286 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

268-30366 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5634 'Boodarie' serial number 8151-07 / 91-120 stands on the Newman mainline with the train. Friday 12th of April 2002.
|
|

269-19366 viewsGoldsworthy Junction, and the Alstom 25-year service agreement special led by BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
|
|

120512 IMG P10174366 viewsWest Kalgoorlie, PTLY type gas tank waggon PTLY 6416. Built by Comeng NSW in 1985 as NTHF type NTHF 416, 76,000 litre gas tank for Boral Gas, recoded to ATLY in 1996, and ATLY type gas tank waggon ATLY 1, built by Comeng NSW in 1968 as a Tg type tank waggon for Boral Gas as Tg 1 on the South Australian Railways, to the VR as TWF type TWF 10 in 1979, then later in 1979 to VTGX type. Off VR register 1988 and to AN as ATLX type ATLX 1, then to ATLY. Peter Donaghy image.
|
|
| 19096 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
709 |  |
 |
 |
 |
 |
 |
 |
|