Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
050421_1386.jpg
050421 1386330 viewsQuarry 8, Magor USA built ballast waggon 513, originally built in 1963 for the Oroville Dam project, before coming to BHP second hand as a ballast waggon in January 1968.
050518_2192.jpg
050518 2192330 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 516, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
060429_3742.jpg
060429 3742330 viewsFlash Butt yard, Pony re-laying waggon 6704 flat waggon, unsure of history or who built it or where it came from, it looks to be heavy duty with riveted side frames and an odd handbrake arrangement.
050625_3592.jpg
050625 3592330 viewsMooka North, BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480. 25th June 2005.
100717_0674.jpg
100717 0674330 viewsFlash Butt yard, new rail stock carrier waggon 6034, built by Gemco Rail in late 2009-10 with Barber bogies.
110208_9445.jpg
110208 9445330 viewsFlash Butt yard, new rail stock carrier waggon 6038 loaded with strings of rail, built by Gemco Rail in late 2009-10 with Barber bogies.
110606_1750.jpg
110606 1750330 viewsFlash Butt yard, CNR-QRRS of China built side dump waggon, built and delivered in early 2011, waggon 0711 awaits the call to duty.
150314_7751.jpg
150314 7751330 viewsBing Siding, empty 82 kL Comeng NSW built tank waggon 0008 one of six such tank waggons built in 1970-71.
150619_9078.jpg
150619 9078330 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0706 loaded with fines for sheeting.
110602_8604.jpg
110602 8604330 viewsRio Tinto compressor waggon set CB 04, compressor control waggon with two diesel powered Atlas Copco XAS 97's and the receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons. Seen here on the causeway just outside of 7 Mile. 2nd June 2011.
170510_8285.jpg
170510 8285330 viewsRio Tinto compressor waggon set CB 09, air receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
243-28.jpg
243-28330 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
080304_2189.jpg
080304 2189330 viewsThomas Yard, down the rail welding end, side view of control waggon 2328, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
080304_2197.jpg
080304 2197330 viewsThomas Yard, down the rail welding end, new FMG ore waggon pair 1059 slave and 2060 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
251-14.jpg
251-14330 viewsNelson Point, BHP's retired Goninan WA's ALCo C636 to GE C36-7M rebuilds, these were the first time in the world that an ALCo C636 had been rebuilt into an GE C36-7, are lined up near the service shop awaiting their fate. The line is 5510, 5506, 5508, 5512, 5513, 5507, 5509, 5511, and, 5513. They had recently been displaced due to the arrival of the AC6000 units which also took their name plates. Only two units would go on to survive 5507 and 5508. 22nd April 2000.
251-34.jpg
251-34330 viewsBing Siding, BHP ballast waggon 509 sits in a dead end siding very much unloved. View of the ballast discharge chutes and the manual handle. Originally an ore waggon and built by Magor USA and was one of the original fleet of waggons to come out to WA with the car dumper at the beginning of the Mt Newman project. 22nd April 2000.
252-13.jpg
252-13330 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, General Electric built 9-44CW unit 7087 with serial number 47766 from the original 1994 build idles away on the western end of the ballast train. Cab side view. Location is roughly here. 24th November 2001.
254-26.jpg
254-26330 viewsBing Siding at the 20 km, an empty train departs south with Goninan rebuild unit 5668 'Dunkirk' an CM40-8MEFI model with serial number 8412-01 / 95-159, one of the last four rebuilds with an EFI 7FDL engine. It is trailing AC6000 unit 6071. September 2001.
255-19.jpg
255-19330 viewsAt the 162.2 km a Robe River Pettibone 445-E Speed Swing high rail crane. CRD 238.
256-29.jpg
256-29330 viewsAt the 89.6 km grade crossing and with the meet at Maitland completed the loaded train continues onto Cape Lambert behind the quad CM40-8M working. May 2002.
19087 files on 955 page(s) 724

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional