Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
233-09.jpg
233-09358 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
233-36.jpg
233-36358 viewsYandi Two balloon loop, new United Goninan WA built iron ore waggon 4161, delivered in March 1997 as part of a batch of 126 waggons made from 3CR12 steel with tapered floors. GeoData.
235-26.jpg
235-26358 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5639 'Corunna Downs' serial 8281-03 / 92-128 sits on a loaded train as second unit awaiting departure time. Note the fuel tank and air receiver unit that tells it was an AE Goodwin built C636 ALCo before rebuild.
236-22.jpg
236-22358 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's Goninan GE rebuilt CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160 sits out the front awaiting attention.
160523_3339.jpg
160523 3339358 viewsWest Kalgoorlie, AQHY 30054 with CSA 0132, originally built by the WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth. CSA 0132 was built by Vcare Engineering, India for Access Petrotec & Mining Solutions in 2015.
160523_3344.jpg
160523 3344358 viewsWest Kalgoorlie, AQHY 30098 with CSA 0127, originally built by the WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth. CSA 0127 was built by Vcare Engineering, India for Access Petrotec & Mining Solutions in 2015.
160523_3587.jpg
160523 3587358 viewsBinduli, nickel concentrate train 2438, WNB type pneumatic discharge nickel concentrate waggon WNB 543, one of six built by Bluebird Rail Services SA in 2010 for BHP Billiton.
160525_4400.jpg
160525 4400358 viewsKalgoorlie, Malcolm freighter, train 3029, AZKY type anhydrous ammonia tank waggon AZKY 32242, the final unit of twelve units built by Goninan WA in 1998 as type WQK for Murrin Murrin traffic, fitted with Bis Industries anhydrous ammonia tank.
161111_2513.jpg
161111 2513358 viewsBinduli, Kalgoorlie Freighter train 5025, waggon ATPY 593 fuel tank waggon built by WAGR Midland Workshops in 1976 as one of four WJP type for AMPOL, capacity of 80500 litres, here in Caltex service.
050319_0142.jpg
050319 0142358 viewsNelson Point, rail recovery and transport train, 1st lead off waggon 6011, built by Scotts of Ipswich 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
050319_0149.jpg
050319 0149358 viewsNelson Point, dumper pilot SD40 3080 with compressor waggon set #1, made up of spacer/ballast waggon 681 and compressor waggon 671, both converted from original Magor built 91 ton ore waggons, painted white.
050518_2158.jpg
050518 2158358 viewsBing Siding. Side view of 1963 built Magor USA waggon 501, the first of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
050518_2161.jpg
050518 2161358 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 502, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
051001_5738.jpg
051001 5738358 viewsBoodarie, the Steel Train or rail recovery and transport train, 1st lead off waggon 6011, built by Scotts of Ipswich 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
060429_3742.jpg
060429 3742358 viewsFlash Butt yard, Pony re-laying waggon 6704 flat waggon, unsure of history or who built it or where it came from, it looks to be heavy duty with riveted side frames and an odd handbrake arrangement.
060429_3755.jpg
060429 3755358 viewsFlash Butt yard, Pony re-laying waggon 6704 special flat waggon on the left coupled to a former Goldsworthy Mining 55 tonnes flat waggon built by Tomlinson Steel from 1966.
060618_6212.jpg
060618 6212358 viewsAbydos Siding, originally built by Difco USA for Goldsworthy Mining Ltd in 1967 as a batch of five, prefixed with 870 in BHP service, 8702 side dump waggon loaded with fines for pad capping.
050801_4762.jpg
050801 4762358 viewsFlash Butt yard, Barclay Mowlem ballast regulator. 1st August 2005.
051001_5668.jpg
051001 5668358 viewsFlash Butt yard, a newly delivered Knox Kershaw KBR 875 ballast regulator serial 015-875-05. 1st October 2005.
080621_2733.jpg
080621 2733358 viewsGillman Siding, view from rear of rail recovery and transport train with new Lead-Off Lead-On waggon STTR class STTR 6214 on the end built by Gemco Rail WA.
19096 files on 955 page(s) 724

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional