Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
251-25.jpg
251-2518 viewsNelson Point hard stand area, BHP's 5631 'Apollo' built new in October 1988 by Goninan as a GE CM39-8 model with serial number 5831-10 / 88-080. One of four such units built in 1988 and delivered in the Mt Newman orange livery. 22nd April 2000.
210322_9584.jpg
210322 958418 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is CRRC Yangtze Rolling Stock Co of China built ballast plough waggon BP 04 on a loaded ballast rake, view of B end. Location is roughly here. 22nd March 2021.
210510_1137.jpg
210510 113718 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTB 016 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
254-14.jpg
254-1418 viewsBoodarie, BHP empty train arrives back at the yard following unloading at Finucane Island behind Goninan built CM39-8 locomotive 5631 'Apollo' serial number 5831-10 / 88-080. The second man is getting out to operate the points. September 2001.
256-27.jpg
256-2718 viewsMaitland Siding, Robe River CM40-8M unit 9419 on an empty train. 9419 was built by ALCo Schenectady NY USA as an ALCo C630 model in October 1967 with serial number 3486-03 for the Chesapeake and Ohio Railroad Company (USA) with road number 2102. It was purchased by Morrison Knudsen for Robe River (along with three sister units) and delivered in January 1975 and repainted and renumbered as 9419 on arrival. 9419 was rebuilt by Goninan WA in October 1990 to become an CM40-8M model with serial number 8109-10 / 90-117. May 2002.
245-22.jpg
245-2218 viewsWudinna, empty grain train shunts out of the grain siding, former Australian National Co-Co locomotives AE Goodwin ALCo model DL531 830 class units 842, serial no. 84140 and 851 serial no. 84137, 851 having been on the Eyre Peninsula since delivered in 1962. 7th April, 2003.
160711_iPh5S_2827.jpg
160711 iPh5S 282718 viewsNatural spring or soak just north east of the old Wittenoom pump station bubbling water at the surface. Location is here.
160409_IMG_7032.jpg
160409 IMG 703218 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
160409_IMG_7033.jpg
160409 IMG 703318 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
283-19.jpg
283-1918 viewsHarding Siding, quad Robe River CM40-8M units 9414, 9420, 9410 and 9425 lead 202 loaded ore waggons at Siding 1 (Harding). The siding has recently been renamed Harding and extended at the north end to accommodate the new West Angelas trains of up to 240 waggons. Wednesday 22nd May 2002.
110620_2490r.jpg
110620 2490r18 viewsWalla, loaded BHP ore waggon 1173, whilst numbered and the ends and sill are from Comeng WA 1971 build of one hundred and eighty-three waggons, the side walls have been totally replaced with rounded bottoms and Goninan style extra ribs. 20th of June 2011.
030712_142552.jpg
030712 14255218 viewsNelson Point, empty BHP ore waggon 553, one of the original Magor USA build waggons bought out at construction of the Mt Newman project. Visible is the ODCX code and number 82190 from the Oroville Dam Construction company days in the USA. Unsure of the MS6-82 code, the DZ 11-95 code was the late time it was internally painted to reduce wear and the SL 76 with 92 below it was the last time the Miner SL-76 draft gear was replaced. 12th of July 2003.
030712_142923.jpg
030712 14292318 viewsNelson Point, empty BHP ore waggon 9020, the prototype leader originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. 12th of July 2003.
030712_143222.jpg
030712 14322218 viewsNelson Point, empty BHP ore waggon 9025 with drop belly floor, originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. 12th of July 2003.
247-24.jpg
247-2417 viewsCape Lambert overview of the fuel point, with a brace of four Goninan WA CM40-8M GE rebuilds finishing up refuelling before departing with another empty train as a loaded rake is dragged to the dumper behind them. The workshops are to the left of the picture. Where I'm standing to take the picture is now all stockpile. Approximate location of photo is here. 22nd May 2002.
247-30.jpg
247-3017 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train is about to pass under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8. Location is here.22nd May 2002.
248-02.jpg
248-0217 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 7077 serial 47756 from the original first order in the Pepsi Can livery from 1994 still looking good some ten years later. Approximate location. 24th April 2004.
248-05.jpg
248-0517 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 9408 serial 54158 from the fourth order in 2003 wearing the Pilbara Rail livery with Robe ownership markings. Approximate location. 24th April 2004.
251-24.jpg
251-2417 viewsNelson Point hard stand area, BHP's 5631 'Apollo' built new in October 1988 by Goninan as a GE CM39-8 model with serial number 5831-10 / 88-080. One of four such units built in 1988 and delivered in the Mt Newman orange livery. 22nd April 2000.
252-01.jpg
252-0117 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, National Steel Car Company of Canada built ballast hopper waggon BH 047 built in January 1971. A batch of twenty were built for Hamersley Iron. Location is roughly here. 24th November 2001.
16103 files on 806 page(s) 731

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional