Most viewed |
![Filename=210322_9575.jpg
Filesize=450KiB
Dimensions=1280x853
Date added=Mar 25, 2021 210322_9575.jpg](albums/Pilbara/Rio_Tinto_Rolling_Stock_-_non_ore/thumb_210322_9575.jpg)
210322 957529 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 091 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
|
|
![Filename=210322_9578.jpg
Filesize=500KiB
Dimensions=1280x853
Date added=Mar 25, 2021 210322_9578.jpg](albums/Pilbara/Rio_Tinto_Rolling_Stock_-_non_ore/thumb_210322_9578.jpg)
210322 957829 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 077 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
|
|
![Filename=210510_1100.jpg
Filesize=573KiB
Dimensions=1280x853
Date added=May 15, 2021 210510_1100.jpg](albums/Pilbara/Rio_Tinto_Rolling_Stock_-_non_ore/thumb_210510_1100.jpg)
210510 110029 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTB 020 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|
![Filename=210510_1105.jpg
Filesize=513KiB
Dimensions=1280x853
Date added=May 15, 2021 210510_1105.jpg](albums/Pilbara/Rio_Tinto_Rolling_Stock_-_non_ore/thumb_210510_1105.jpg)
210510 110529 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTB 015 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|
![Filename=210510_1140.jpg
Filesize=602KiB
Dimensions=1280x853
Date added=May 15, 2021 210510_1140.jpg](albums/Pilbara/Rio_Tinto_Rolling_Stock_-_non_ore/thumb_210510_1140.jpg)
210510 114029 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTB 013 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|
![Filename=210510_1142.jpg
Filesize=595KiB
Dimensions=1280x853
Date added=May 15, 2021 210510_1142.jpg](albums/Pilbara/Rio_Tinto_Rolling_Stock_-_non_ore/thumb_210510_1142.jpg)
210510 114229 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTB 011 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|
![Filename=256-08.jpg
Filesize=588KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-08.jpg](albums/Pilbara/256/thumb_256-08.jpg)
256-0829 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|
![Filename=256-18.jpg
Filesize=528KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-18.jpg](albums/Pilbara/256/thumb_256-18.jpg)
256-1829 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
|
|
![Filename=257-05.jpg
Filesize=675KiB
Dimensions=1280x853
Date added=Mar 12, 2022 257-05.jpg](albums/Pilbara/257/thumb_257-05.jpg)
257-0529 viewsFlash Butt yard BHP's stored Goninan WA ALCo C636 to GE C36-7M rebuild unit 5512 awaits its fate. Rebuilt in 1988 at Goninan's Welshpool factory from a 1970 AE Goodwin built ALCo C636 with serial number G6041-1 and road number 5455 and assigned new serial number 4839-01 / 88-077. It was delivered in Mount Newman Mining orange and was named Hesta. Late 2001.
|
|
![Filename=140601_4616.jpg
Filesize=580KiB
Dimensions=1280x853
Date added=Aug 29, 2022 140601_4616.jpg](albums/WA_Scans/Mineral_Resources_Ltd_Ore_Services/thumb_140601_4616.jpg)
140601 461629 viewsMidland, loaded iron ore train #1030 heading to Kwinana, CFCLA leased CHEY type waggon CHEY 8060 one pair of 120 bar coupled pairs built by Bluebird Rail Operations SA in 2011-12. 1st June 2014.
|
|
![Filename=267-03.jpg
Filesize=567KiB
Dimensions=1280x853
Date added=Nov 21, 2022 267-03.jpg](albums/Pilbara/267/thumb_267-03.jpg)
267-0329 viewsGoldsworthy Junction, BHP's 1230 empty departure behind General Electric AC6000 unit 6076 'Mt Goldsworthy' serial number 51068 leads CM40-8MEFI 5669 on the point with mid-train units CM40-8M units 5651 and 5645 104 waggons back with 104 waggons trailing. 1247 hrs 12th of April 2002.
|
|
![Filename=160708_iPh5S_2784.jpg
Filesize=360KiB
Dimensions=1280x853
Date added=Mar 31, 2023 160708_iPh5S_2784.jpg](albums/Pilbara_non_IO/Wittenoom_Area_Current_Images/thumb_160708_iPh5S_2784.jpg)
160708 iPh5S 278429 viewsWittenoom, view looking south at the fog hanging over Mount Watkins and the Hammersley Range from 53 Fifth Avenue Wittenoom, taken at 3:15pm, 8th of July 2016. Geodata.
|
|
![Filename=160710_iPh5S_2803.jpg
Filesize=625KiB
Dimensions=1280x853
Date added=Mar 31, 2023 160710_iPh5S_2803.jpg](albums/Pilbara_non_IO/Wittenoom_Area_Current_Images/thumb_160710_iPh5S_2803.jpg)
160710 iPh5S 280329 viewsWittenoom Gorge, Colonial Mine, view looking across the level to adits #28 and #27. Tailings fill has eroded, old track points or switches stacked up. Geodata.
|
|
![Filename=283-02.jpg
Filesize=556KiB
Dimensions=1280x853
Date added=Jun 19, 2023 283-02.jpg](albums/Pilbara/283/thumb_283-02.jpg)
283-0229 viewsNelson Point, BHP wheel lathe sees BHP's big GE AC6000 unit 6073 'Fortescue' serial number 51065 on shed having wheel attention to the leading bogie. May 2002.
|
|
![Filename=130710_1049.jpg
Filesize=463KiB
Dimensions=1280x853
Date added=Jun 30, 2023 130710_1049.jpg](albums/Waggons_consists_SCT/3PM9_130710/thumb_130710_1049.jpg)
130710 104929 viewsParkeston, SCT train 3PG1, ABSY type ABSY 2792 covered van, originally built by Carmor Engineering SA in 1976 as a VFX type covered van for Commonwealth Railways, recoded to ABFX and converted from ABFY by Gemco WA in 2004/05 to ABSY.
|
|
![Filename=110620_2296r.jpg
Filesize=559KiB
Dimensions=1280x853
Date added=Aug 18, 2023 110620_2296r.jpg](albums/Pilbara/BHP_Rolling_Stock_-_Ore/thumb_110620_2296r.jpg)
110620 2296r29 viewsWalla, loaded BHP ore waggon 1418 is a Goninan WA build to the Golynx design as a replacement body from February 2011. This replaces the original Comeng WA waggon of the same number. 20th of June 2011.
|
|
![Filename=110620_2489r.jpg
Filesize=519KiB
Dimensions=1280x853
Date added=Aug 18, 2023 110620_2489r.jpg](albums/Pilbara/BHP_Rolling_Stock_-_Ore/thumb_110620_2489r.jpg)
110620 2489r29 viewsWalla, loaded BHP ore waggon 1035, the resheeting is obvious with the stich welds along the ribs, 1035 is one of the four hundred waggons built by Comeng WA in 1971, when the numbering reached 2999 they start numbering upwards from 1001. 20th of June 2011.
|
|
![Filename=030712_143222.jpg
Filesize=495KiB
Dimensions=1280x853
Date added=Aug 18, 2023 030712_143222.jpg](albums/Pilbara/BHP_Rolling_Stock_-_Ore/thumb_030712_143222.jpg)
030712 14322229 viewsNelson Point, empty BHP ore waggon 9025 with drop belly floor, originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. 12th of July 2003.
|
|
![Filename=030712_143247.jpg
Filesize=508KiB
Dimensions=1280x853
Date added=Aug 18, 2023 030712_143247.jpg](albums/Pilbara/BHP_Rolling_Stock_-_Ore/thumb_030712_143247.jpg)
030712 14324729 viewsNelson Point, empty BHP ore waggon 9024, originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. This view shows the reduced gap between waggons reduced from 1084 to 934 mm to aid the aerodynamics. 12th of July 2003.
|
|
![Filename=231020_8201.jpg
Filesize=795KiB
Dimensions=1280x853
Date added=Nov 19, 2023 231020_8201.jpg](albums/Waggons_consists_Aurizon/4UP1_231020/thumb_231020_8201.jpg)
231020 820129 viewsParkeston, QQYY type 40' container waggon QQYY 57711 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000344 with Tronox decal and CRM 001121 with Cristal decal, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
|
|
16260 files on 813 page(s) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
734 | ![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
|