Most viewed |

100603 9016136 viewsParkeston, SCT train 3MP9, PBGY type covered van PBGY 0045 Multi-Freighter, one of eighty two waggons built by Queensland Rail Redbank Workshops in 2005.
|
|

100731 03078135 viewsWO type iron ore waggon WO 31212 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 108 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, empty train arriving at Binduli Triangle, 31st July 2010. This unit was converted to WOS superphosphate in the late 1980s till 1994 when it was re-classed back to WO.
|
|

100731 03174135 viewsWO type iron ore waggon WO 31292 is one of a batch of fifteen built by WAGR Midland Workshops between July and October 1968 with fleet number 171 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, empty train arriving at Binduli Triangle, 31st July 2010.
|
|

100822 6227135 viewsWOE type iron ore waggon WOE 33567 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-107 and fleet number 9058 for Koolyanobbing iron ore operations, on empty train 1416 at Hampton, 22nd August 2010.
|
|

100822 6326135 viewsWOE type iron ore waggon WOE 30258 is one of a batch of one hundred and thirty built by Goninan WA between March and August 2001 with serial number 950092-008 and fleet number 608 for Koolyanobbing iron ore operations of 83 tonne load capacity, on empty train 1416 at Hampton, 22nd August 2010.
|
|

130703 0164135 viewsMurdinga, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of two originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513, fitted with dynamic brakes, started working on the Eyre Peninsula in November 2004.
|
|

130705 0571135 viewsLock, HAN type bogie grain hopper waggon HAN 28, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system. 5th July 2013.
|
|

130705 0580135 viewsLock, located at the 148.5 km and originally named Terre when opened in May 1913, later renamed to Lock in December 1921. From the left background is the Ascom silo complex (Block 5), then blocks 2, 1 and 3, the train is on the mainline with the horizontal bunker (Block 4) on the right. 5th of July 2013.
|
|

233-26135 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train around at 1.2 km/h with assistance from two sister units, the end of the 112 waggon or one rake consist can be seen in the middle background. GeoData.
|
|

235-33135 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5654 'Kashima' serial 8412-11 / 93-145 sits on a loaded train awaiting departure time and also has the late marigold style BHP logo, cab side and Alco Hi-Ad bogie.
|
|

243-27135 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|

080304 2196r135 viewsThomas Yard, down the rail welding end, new FMG ore waggon pair 1611 slave and 2612 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

080304 2199135 viewsThomas Yard, down the rail welding end, new FMG ore waggon pair 1633 slave and 2634 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

246-12135 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
|
|

247-15135 viewsCape Lambert overview of the fuel point, with a brace of four CM40-8M rebuilds finishing up refuelling before departing with another empty train. The workshops are to the left of the picture. Where I'm standing to take the picture is now all stockpile. Approximate location of photo is here. 22nd May 2002.
|
|

247-26135 viewsCape Lambert fuel point, Robe River locomotive 9420 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8109-03 / 91-119 from March 1991 riding on Hi-Ad bogies and was originally an ALCo Schenectady built C630 serial 3486-4 and built new for Chesapeake & Ohio (USA) as their 2103. It is one of four C630 ALCo units purchased in 1974 and delivered to Robe in January 1975. Everything below the frame is ALCo while above is GE and Pilbara Cab. Approximate location of the locos is here. 22nd May 2002.
|
|

252-19135 viewsBetween Pelican and Possum sidings, bridge at the 220.6 km. Location is roughly here.
|
|

210510 1098135 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTB type end rail waggon RTB 022 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

210510 1137135 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTB 016 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

210510 1138135 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTB 015 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|
16911 files on 846 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
738 |  |
 |
 |
 |
 |
 |
 |
|