Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
240328_3035.jpg
240328 303538 viewsHampton and Aurizon loaded iron ore train 5041 with a rake of MHLY and MHPY waggons runs south towards Esperance from Koolyanoobing through the dip at the 19 km on the Esperance line. 28th of March 2024.
248-11.jpg
248-1137 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 7077 serial 47756 from the original first order in the Pepsi Can livery and 9408 serial 54158 from the fourth order in the Pilbara Rail livery with Robe ownership markings. Approximate location. 24th April 2004.
252-33.jpg
252-3337 viewsPort Hedland at 12 Mile Creek a loaded Yarrie train crosses over the creek behind Goninan CM40-8M GE rebuild unit 5645 'Sherlock' serial number 8281-11 / 92-134. Early December 2001.
253-06.jpg
253-0637 viewsDugite near the 64 km on the Dampier - Tom Price railway, second unit on a loaded Hamersley Iron train General Electric 9-44CW unit 7096 from the second order of locomotives with serial number 52843.
254-24.jpg
254-2437 viewsBing Siding, an empty train departs behind 6071 an General Electric built AC6000 model with serial number 51063. The locomotive has not yet been named. Second unit is Goninan rebuilt CM40-8MEFI locomotive 5668. September 2001.
254-27.jpg
254-2737 viewsBing Siding at the 20 km, an empty train departs south with Goninan rebuild unit 5668 'Dunkirk' an CM40-8MEFI model with serial number 8412-01 / 95-159, one of the last four rebuilds with an EFI 7FDL engine. It is trailing AC6000 unit 6071. September 2001.
255-19.jpg
255-1937 viewsAt the 162.2 km a Robe River Pettibone 445-E Speed Swing high rail crane. CRD 238.
256-33.jpg
256-3337 viewsAt the 89.6 km grade crossing the loaded train behind the quad CM40-8M working of 9414, 9420, 9410 and 9425 rolls across the crossing and heads down the 1.26 percent grade. 9414 was built by AE Goodwin NSW as an ALCo M636 model in December 1971 with serial number G-6060-5 and part of the original order for five units. Locomotive was delivered to Robe River in January 1972 with Bechtel Pacific road umber 262.005 for construction use and was renumbered 1714 when that was completed. 9414 was rebuilt by Goninan WA in November 1991 to become an CM40-8M model with serial number 8206-11 / 91-124. May 2002.
245-22.jpg
245-2237 viewsWudinna, empty grain train shunts out of the grain siding, former Australian National Co-Co locomotives AE Goodwin ALCo model DL531 830 class units 842, serial no. 84140 and 851 serial no. 84137, 851 having been on the Eyre Peninsula since delivered in 1962. 7th April, 2003.
245-28.jpg
245-2837 viewsYaninee, trailing view of an empty grain train as it trundles over Hunt Terrace with its motely collection of grain waggons as it runs 'express' through Yaninee. 7th April, 2003.
190129_4333.jpg
190129 433337 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00047 built by CSR Yangtze Co China serial 2014/382-47 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190129_4338.jpg
190129 433837 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00161 built by CSR Yangtze Co China serial 2014/382-161 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190129_4341.jpg
190129 434137 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00230 built by CSR Yangtze Co China serial 2014/382-230 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
140601_4468.jpg
140601 446837 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHCH type waggon CHCH 7745 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
140601_4502.jpg
140601 450237 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHCH type waggon CHCH 7794 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
140601_4618.jpg
140601 461837 viewsMidland, loaded iron ore train #1030 heading to Kwinana, CFCLA leased CHEY type waggon CHEY 8009 one pair of 120 bar coupled pairs built by Bluebird Rail Operations SA in 2011-12. 1st June 2014.
140601_4666.jpg
140601 466637 viewsMidland, loaded iron ore train #1030 heading to Kwinana, CFCLA leased CHCH type waggon CHCH 7747 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
268-03.jpg
268-0337 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
268-05.jpg
268-0537 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
268-21.jpg
268-2137 viewsAt the 39 km detection site with the Alstom 25-year special, the Sundowner coach, originally built by E. G. Budd in 1939 numbered 301 as the Silver Star, a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port. 12th of April 2002.
16480 files on 824 page(s) 744

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional