Most viewed |

231020 8235129 viewsParkeston, QQYY type 40' container waggon QQYY 57836 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 001064 with Tronox decal and yellow corner posts and CRM 000783 with Tronox decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
|
|

231020 8249129 viewsParkeston, QQYY type 40' container waggon QQYY 57849 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000045 with Tronox decal and yellow corner posts and CRM 000075 with Tronox decals and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
|
|

100603 9009129 viewsParkeston, SCT train 3MP9, ARBY type ARBY 4430 refrigerated van, originally built by Comeng WA in 1977 as a VFX type covered van for Commonwealth Railways, recoded to ABFX and converted from ABFY by Gemco WA in 2004/05 to ARBY.
|
|

100603 9027129 viewsParkeston, SCT train 3MP9, ABSY type covered van ABSY 2475, originally built by Mechanical Handling Ltd SA in 1972 for Commonwealth Railways as VFX type recoded to ABFX and then RBFX before being converted from ABFY by Gemco WA to ABSY type in 2004/05.
|
|

240401 4996129 viewsKalgoorlie, Aurizon's 1029 Malcolm Freighter, waggon AQNY 32168, one of sixty two waggons built by Goninan WA in 1998 as the WQN type for Murrin Murrin container traffic loaded with two 20' sulphur containers, a 25U0 type hard top BISU 100017 [3] and Bis Industries 55UA type roll top SBIU 200638 [0]. 1st of April 2024.
|
|

240401 4998129 viewsKalgoorlie, Aurizon's 1029 Malcolm Freighter, waggon AQNY 32180, one of sixty two waggons built by Goninan WA in 1998 as the WQN type for Murrin Murrin container traffic loaded with two 20' 25U0 type hard top sulphur containers, BISU 100015 [2] and BISU 100004 [4]. 1st of April 2024.
|
|

130705 0589128 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1.
|
|

130705 0593128 viewsLock, having stowed the loaded portion on the mainline, the three locos 1203, 846 and 859 shunt back on to the empty portion on goods siding #1.
|
|

247-30128 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train is about to pass under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8. Location is here.22nd May 2002.
|
|

248-10128 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 9408 serial 54158 from the fourth order in 2003 wearing the Pilbara Rail livery with Robe ownership markings. The blue 230 sign is the indication that there is 230 waggons in clear at that point. Approximate location. 24th April 2004.
|
|

251-28128 viewsNelson Point hard stand area, drivers side profile view of BHP's 5631 'Apollo' built new in October 1988 by Goninan as a GE CM39-8 model with serial number 5831-10 / 88-080. One of four such units built in 1988 and delivered in the Mt Newman orange livery. 22nd April 2000.
|
|

210322 9578128 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 077 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
|
|

210510 1103128 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTB 017 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

253-19128 viewsPort Hedland harbour sees the suction / cutter dredge Vlaanderen XI with IMO #7712080. The Vlaanderen XI was originally built in 1978 by IHC Dredgers with yard number 1108 and originally named New Amsterdam, named the Vlaanderen XI in 1986, renamed again in 2007 to Kaveri and again to Huta 15 in 2014.
|
|

254-19128 viewsBing Siding, an empty train awaits departure time behind 6071 an General Electric built AC6000 model with serial number 51063. The locomotive has not yet been named. Side view. September 2001.
|
|

255-02128 viewsFortescue River bridge on the Robe River Cape Lambert to Deepdale line at the 115.8 km looking south. Geodata location here. May 2002.
|
|

255-08128 viewsSiding Three, swing nose point machine on the south end points riding on concrete sleepers at the 134.7 km. May 2002.
|
|

255-14128 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur curving away to the left while the Deepdale line is on the right. Geodata location here. May 2002.
|
|

255-25128 viewsWestern Creek at the 71 km on the Cape Lambert to Deepdale line an empty Robe River train powers upgrade as it heads to Mesa J for loading behind the standard quad CM40-8M lash up. Geodata location here. May 2002.
|
|

256-14128 views89.6 km, Toyota Landcruiser HJ75, waiting for a train. May 2002.
|
|
16911 files on 846 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
752 |  |
 |
 |
 |
 |
 |
 |
|