Most viewed |
![Filename=254-06.jpg
Filesize=325KiB
Dimensions=1280x853
Date added=Sep 12, 2021 254-06.jpg](albums/Pilbara/254/thumb_254-06.jpg)
254-0619 viewsWalla Siding, 55 km area, spinifex fire beside the access road.
|
|
![Filename=254-23.jpg
Filesize=366KiB
Dimensions=1280x853
Date added=Sep 12, 2021 254-23.jpg](albums/Pilbara/254/thumb_254-23.jpg)
254-2319 viewsBing Siding, cab side view of General Electric AC6000 unit 6071 serial number 51063 with the driver about to enter the cab. The locomotive has not yet been named 'Chichester' in this image. September 2001.
|
|
![Filename=255-05.jpg
Filesize=523KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-05.jpg](albums/Pilbara/255/thumb_255-05.jpg)
255-0519 viewsSiding Three looking south across the 133.3 km grade crossing with Tamper 1 and a sleeper inserter machine stabled in the back track. Both machines are Fairmont Tamper units. Geodata location here. May 2002.
|
|
![Filename=255-20.jpg
Filesize=499KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-20.jpg](albums/Pilbara/255/thumb_255-20.jpg)
255-2019 viewsWestern Creek, looking south alongside the Hamersley Iron Dampier to Tom Price line on the right with the new Robe River interconnecting line on the left as both lines pass under the Robe River Cape Lambert to Deepdale line bridge. Geodata location here. May 2002.
|
|
![Filename=255-32.jpg
Filesize=528KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-32.jpg](albums/Pilbara/255/thumb_255-32.jpg)
255-3219 viewsWestern Creek at the 71 km on the Cape Lambert to Deepdale line an empty Robe River train powers upgrade behind the standard quad CM40-8M lash up led by Goninan CM40-8M unit 9425, 9410, 9420 and 9414 with serial number 8206-11 / 91-124. The Western Creek interconnecting line can be seen branching off to the right. Geodata location here. May 2002.
|
|
![Filename=256-24.jpg
Filesize=566KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-24.jpg](albums/Pilbara/256/thumb_256-24.jpg)
256-2419 viewsMaitland Siding, Robe River CM40-8M unit 9417 (2nd) leading an empty train passes sister units 9420 and 9410 on a loaded train. May 2002.
|
|
![Filename=256-28.jpg
Filesize=494KiB
Dimensions=1280x853
Date added=Nov 20, 2021 256-28.jpg](albums/Pilbara/256/thumb_256-28.jpg)
256-2819 viewsAt the 89.6 km grade crossing and with the meet at Maitland completed the loaded train continues onto Cape Lambert behind the quad CM40-8M working. May 2002.
|
|
![Filename=190129_4238.jpg
Filesize=616KiB
Dimensions=1280x853
Date added=Aug 29, 2022 190129_4238.jpg](albums/WA_Scans/Mineral_Resources_Ltd_Ore_Services/thumb_190129_4238.jpg)
190129 423819 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00050 built by CSR Yangtze Co China serial 2014/382-50 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
![Filename=190129_4240.jpg
Filesize=632KiB
Dimensions=1280x853
Date added=Aug 29, 2022 190129_4240.jpg](albums/WA_Scans/Mineral_Resources_Ltd_Ore_Services/thumb_190129_4240.jpg)
190129 424019 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00006 built by CSR Yangtze Co China serial 2014/382-6 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
![Filename=190129_4241.jpg
Filesize=603KiB
Dimensions=1280x853
Date added=Aug 29, 2022 190129_4241.jpg](albums/WA_Scans/Mineral_Resources_Ltd_Ore_Services/thumb_190129_4241.jpg)
190129 424119 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00005 built by CSR Yangtze Co China serial 2014/382-5 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
![Filename=190129_4271.jpg
Filesize=660KiB
Dimensions=1280x853
Date added=Aug 29, 2022 190129_4271.jpg](albums/WA_Scans/Mineral_Resources_Ltd_Ore_Services/thumb_190129_4271.jpg)
190129 427119 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00070 built by CSR Yangtze Co China serial 2014/382-70 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
![Filename=190129_4285.jpg
Filesize=640KiB
Dimensions=1280x853
Date added=Aug 29, 2022 190129_4285.jpg](albums/WA_Scans/Mineral_Resources_Ltd_Ore_Services/thumb_190129_4285.jpg)
190129 428519 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00158 built by CSR Yangtze Co China serial 2014/382-158 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
![Filename=190129_4292.jpg
Filesize=649KiB
Dimensions=1280x853
Date added=Aug 29, 2022 190129_4292.jpg](albums/WA_Scans/Mineral_Resources_Ltd_Ore_Services/thumb_190129_4292.jpg)
190129 429219 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00267 built by CSR Yangtze Co China serial 2014/382-267 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
![Filename=190129_4305.jpg
Filesize=631KiB
Dimensions=1280x853
Date added=Aug 29, 2022 190129_4305.jpg](albums/WA_Scans/Mineral_Resources_Ltd_Ore_Services/thumb_190129_4305.jpg)
190129 430519 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00294 built by CSR Yangtze Co China serial 2014/382-294 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
![Filename=190129_4323.jpg
Filesize=675KiB
Dimensions=1280x853
Date added=Aug 29, 2022 190129_4323.jpg](albums/WA_Scans/Mineral_Resources_Ltd_Ore_Services/thumb_190129_4323.jpg)
190129 432319 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00079 built by CSR Yangtze Co China serial 2014/382-79 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
![Filename=190129_4324.jpg
Filesize=705KiB
Dimensions=1280x853
Date added=Aug 29, 2022 190129_4324.jpg](albums/WA_Scans/Mineral_Resources_Ltd_Ore_Services/thumb_190129_4324.jpg)
190129 432419 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00328 built by CSR Yangtze Co China serial 2014/382-328 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
![Filename=190129_4332.jpg
Filesize=630KiB
Dimensions=1280x853
Date added=Aug 29, 2022 190129_4332.jpg](albums/WA_Scans/Mineral_Resources_Ltd_Ore_Services/thumb_190129_4332.jpg)
190129 433219 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00048 built by CSR Yangtze Co China serial 2014/382-48 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
![Filename=140601_4502.jpg
Filesize=589KiB
Dimensions=1280x853
Date added=Aug 29, 2022 140601_4502.jpg](albums/WA_Scans/Mineral_Resources_Ltd_Ore_Services/thumb_140601_4502.jpg)
140601 450219 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHCH type waggon CHCH 7794 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
|
|
![Filename=140601_4506.jpg
Filesize=588KiB
Dimensions=1280x853
Date added=Aug 29, 2022 140601_4506.jpg](albums/WA_Scans/Mineral_Resources_Ltd_Ore_Services/thumb_140601_4506.jpg)
140601 450619 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHCH type waggon CHCH 7651 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
|
|
![Filename=140601_4614.jpg
Filesize=611KiB
Dimensions=1280x853
Date added=Aug 29, 2022 140601_4614.jpg](albums/WA_Scans/Mineral_Resources_Ltd_Ore_Services/thumb_140601_4614.jpg)
140601 461419 viewsMidland, loaded iron ore train #1030 heading to Kwinana, CFCLA leased CHEY type waggon CHEY 8037 one pair of 120 bar coupled pairs built by Bluebird Rail Operations SA in 2011-12. 1st June 2014.
|
|
16258 files on 813 page(s) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
759 | ![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
|