Most viewed |

160409 IMG 7099217 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160409 IMG 7267217 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160412 IMG 7356217 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160412 IMG 7369217 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

231020 8141217 viewsParkeston, 6020 class locomotive 6025 was built by Goninan NSW as a GE C44ACi model with serial number R0093-11 / 12-478 in 2012 and trails on 4UP1 along the mainline at Parkeston enroute to Kwinana, 20th of October 2023.
|
|

231020 8196217 viewsParkeston, QQYY type 40' container waggon QQYY 57713 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 001036 with Tronox decal and CRM 000174 with Tronox decal, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
|
|

231020 8235217 viewsParkeston, QQYY type 40' container waggon QQYY 57836 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 001064 with Tronox decal and yellow corner posts and CRM 000783 with Tronox decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
|
|

231020 8250217 viewsParkeston, QQYY type 40' container waggon QQYY 57695 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000991 with Cristal decal and CRM 000052 with Tronox decal, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
|
|

240328 3006217 viewsLoaded Koolyanobbing iron ore train 5041 with Mineral Resources Ltd MHPY type iron ore waggons MHPY 00366 and MHPY 00365 built by CSR Yangtze Co China with serial numbers 2014 / 382-366 and 2014 / 382-365 in 2014 as a batch of 382 pairs, these bottom discharge hopper waggons are operated in 'married' pairs. March 28, 2024.
|
|

100731 02379216 viewsWOE type iron ore waggon WOE 33581 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-121 and fleet number 9084 for Koolyanobbing iron ore operations, on loaded train 6413 at Binduli Triangle, 31st July 2010.
|
|

130703 0196216 viewsTooligie, overview of the four cell concrete grain silo complex with the loading spout, dual unloading grids on the right where the shunting tractor is parked. Geo location. 3rd July 2013.
|
|

130704 0408216 viewsKyancutta, south bound loaded grain train has stopped here to collect a loaded rack of grain waggons, the second driver has just restored the points for the mainline as the train waits across the Eyre Highway grade crossing and one of only three electric signals on the network, behind EMD 1204 and twin ALCo 830 units 873 and 851. 4th July 2013.
|
|

130705 0590216 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1.
|
|

130705 0611216 viewsLock, up end looking down through Lock, Ascom silo block #5 on the left, Viterra fast loader loading train while loaded portion sits on the mainline.
|
|

233-20216 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

234-26216 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View looking from 5658 back to the ore stockpile at the loadout. Circa 1998.
|
|

234-29216 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. Cab front on view. Circa 1998.
|
|

070607 10040216 viewsMidland, Pacific National RZBY type crew accommodation car RZBY 911 on train 2SP5, built by Comeng NSW as ER type stainless steel air conditioned crew dormitory car ER 211 in 1969, renumbered to ER 911 in 1974, sold to National Rail and converted to crew car in 1997.
|
|

246-07216 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
|
|

243-33216 viewsNelson Point departure yard, no. 2 end view of BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan WA in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|
18739 files on 937 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
776 |  |
 |
 |
 |
 |
 |
 |
|