Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
030411_105204_Kimba_bunkers.avi
030411 105204 Kimba bunkers235 viewsKimba Grain Bunker video overview, power plant running, best viewed in IE as chrome won't support the player.
223-22.jpg
223-22235 viewsPossum Siding, Hamersley Iron loco 7082 a General Electric built Dash 9-44CW serial 47761 leads sister unit 7080 with an empty train just inside the loop waiting to effect a crew change. 21st October 2000
237-02.jpg
237-02235 viewsWater damaged culverts located on the upper reaches of the Edgina Creek, near the Woodstock South location on the BHP Newman line. Geo Data .
160522_2035.jpg
160522 2035235 viewsParkeston, 5MP2 steel train, Trans-Perth electric B Set 116, driving car BEB 5116 being transferred from the manufacturer in Qld to Perth.
244-02.jpg
244-02235 viewsPort Augusta yard, a pair of ALF class units on the Darwin line construction shunt a rail transport waggon as an SP service wait for departure time with a pair of NR class units. ALF 20 and ALF 18 are both Morrison Knudsen rebuilds, model JT26C-2M serials 94-AN-020 and 94-AN-018.
244-08.jpg
244-08235 viewsPort Augusta yard, Australian Southern decal on the side of ALF 20.
242-18.jpg
242-18235 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068 with engine and alternator removed. May 2002.
250-27.jpg
250-27235 viewsCape Lambert yard on the Load Box Spur is recently stored Robe River AE Goodwin built ALCo M636 unit 9413 serial G6060-4 from December 1971, originally numbered 262.004 during construction, renumbered to 86-14-1713 with number boards 1713 and finally 9413. The ducting on the hood is the air to air intercooler modifications. 22nd October 2000.
188-05.jpg
188-05234 viewsHenty, located 580 km from Sydney on the NSW Main South, looking towards the station building across the yard, two V/Line grain waggons in the yard. Goods shed and platform on the right. Geo Data.
198-17.jpg
198-17234 viewsPort Hedland Port, view of the Cargill Salt berth and loader, or PHPA Berth No. 3, in this 2001 view, the then new bulker loader is under construction and manganese is stockpiled on the ground. The BHP Finucane Island berth is visible along with the overland conveyor for the HBI plant.
203-11.jpg
203-11234 viewsBing Siding, BHP Iron Ore General Electric AC6000 model 6076 'Mt Goldsworthy' serial 51068 with an empty train. Cab side view with name board, steerable bogie and Driver Cosgrove at the controls.
204-09.jpg
204-09234 viewsYampire Gorge, warning sign courtesy of the Department of Regional Development and North West.
210-03.jpg
210-03234 viewsWeipa, Lorim Point, Comalco rail dump station, view of the hydraulic jacking or indexing arms located on the Andoom side of the unloader, used to position the train for unloading.
217-09.jpg
217-09234 viewsKeswick Terminal, logo on the side of passenger coach as part of 'The Ghan' consist from Adelaide to Alice Springs.
030405_132956.jpg
030405 132956234 viewsWudinna, view of the 5 ton revolving jib yard crane and loading ramp with the SACBH silo complex behind and the narrow gauge siding in the foreground, 5th April 2003.
030409_080717.jpg
030409 080717234 viewsWarramboo, empty grain prepares to get underway following a crew change. Rebuild unit DA 7 in Australian Southern orange and black livery leads a pair of AE Goodwin built ALCo model DL531 830 class units 872 and 871, the relieved crew get in their car with the SACBH concrete silo complex behind.
030409_081011.jpg
030409 081011234 viewsWarramboo, third unit 830 class 871 AE Goodwin ALCo model DL531 serial G3422-01 was delivered new to the Eyre Peninsula in January 1966.
237-01.jpg
237-01234 viewsWater damaged culverts located on the upper reaches of the Edgina Creek, near the Woodstock South location on the BHP Newman line. Geo Data .
WTT_Addenda_1983-05-16.pdf
WTT Addenda 1983-05-16234 viewsWorking Time-Table Addenda 1983, complete 53 page PDF download, 4.00 MB.
15333.jpg
15333234 viewsBassendean, an unidentified Goninan rebuild GE CM40-8M unit for BHP Iron Ore under construction. Date Feb 1994.
Jim Bisdee photo.
16480 files on 824 page(s) 78

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional