Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
253-24.jpg
253-2427 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggon CHRY 753.
253-26.jpg
253-2627 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggon CHRY 755.
253-32.jpg
253-3227 viewsNelson Point yard sees BHP dumper pilot locomotives 5666 'Taranto', a Goninan GE rebuild CM40-8MEFI model with serial 8412-11 / 94-157, 5666 was the first unit fitted with Electronic Fuel Injection to the 16FDL engine hence the EFI on the model designation, and in the background with compressor set #2 is 5633 which was a new build CM39-8 GE model by Goninan. A sharp eye will notice the difference in the fuel tanks of the two locomotives.
253-33.jpg
253-3327 viewsNelson Point yard sees BHP dumper pilot locomotive 5666 'Taranto', a Goninan GE rebuild CM40-8MEFI model with serial 8412-11 / 94-157, 5666 was the first unit fitted with Electronic Fuel Injection to the 16FDL engine hence the EFI on the model designation.
254-06.jpg
254-0627 viewsWalla Siding, 55 km area, spinifex fire beside the access road.
254-23.jpg
254-2327 viewsBing Siding, cab side view of General Electric AC6000 unit 6071 serial number 51063 with the driver about to enter the cab. The locomotive has not yet been named 'Chichester' in this image. September 2001.
255-14.jpg
255-1427 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur curving away to the left while the Deepdale line is on the right. Geodata location here. May 2002.
255-17.jpg
255-1727 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur curving away to the left. Geodata location here. May 2002.
255-20.jpg
255-2027 viewsWestern Creek, looking south alongside the Hamersley Iron Dampier to Tom Price line on the right with the new Robe River interconnecting line on the left as both lines pass under the Robe River Cape Lambert to Deepdale line bridge. Geodata location here. May 2002.
255-22.jpg
255-2227 viewsWestern Creek, looking south alongside the Hamersley Iron Dampier to Tom Price line on the right with the new Robe River interconnecting line on the left as both lines pass under the Robe River Cape Lambert to Deepdale line bridge. Geodata location here. May 2002.
255-23.jpg
255-2327 viewsWestern Creek, looking south alongside the Robe River interconnecting line with the Western Creek bridge, in the far background the pole line is the Hamersley Iron Dampier to Tom Price line. Geodata location here. May 2002.
255-32.jpg
255-3227 viewsWestern Creek at the 71 km on the Cape Lambert to Deepdale line an empty Robe River train powers upgrade behind the standard quad CM40-8M lash up led by Goninan CM40-8M unit 9425, 9410, 9420 and 9414 with serial number 8206-11 / 91-124. The Western Creek interconnecting line can be seen branching off to the right. Geodata location here. May 2002.
257-21.jpg
257-2127 viewsFlash Butt yard, compressor set #5. Modified Magor USA built ore waggons to form the compressor set, used during the unloading process. Late 2001.
257-24.jpg
257-2427 viewsGoldsworthy Junction, an empty train runs between the junction and the Broome Rd crossing behind the standard single locomotive 5646 'White Springs', a Goninan 1992 built GE CM40-8 model with serial number 5244-11 / 92-135. Late 2001.
190129_4245.jpg
190129 424527 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00063 built by CSR Yangtze Co China serial 2014/382-63 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190129_4257.jpg
190129 425727 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00358 built by CSR Yangtze Co China serial 2014/382-358 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190129_4269.jpg
190129 426927 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00183 built by CSR Yangtze Co China serial 2014/382-183 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190129_4275.jpg
190129 427527 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00130 built by CSR Yangtze Co China serial 2014/382-130 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190129_4278.jpg
190129 427827 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00074 built by CSR Yangtze Co China serial 2014/382-74 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190129_4293.jpg
190129 429327 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00268 built by CSR Yangtze Co China serial 2014/382-268 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
16480 files on 824 page(s) 784

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional