Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
252-20.jpg
252-2020 viewsNelson Point BHP Iron Ore's General Electric built AC6000 unit 6074 'Kalgan' serial number 51066 is shutdown near the wheel lathe. Early December 2001.
252-24.jpg
252-2420 viewsAbydos area, known as the China Wall or London Wall.
252-34.jpg
252-3420 viewsPort Hedland at 12 Mile Creek a loaded Yarrie train about the cross the Broome Rd at the 19.4 km behind Goninan CM40-8M GE rebuild unit 5645 'Sherlock' serial number 8281-11 / 92-134. Early December 2001.
253-08.jpg
253-0820 viewsPort Hedland harbour sees the suction / cutter dredge Vlaanderen XI with IMO #7712080. The Vlaanderen XI was originally built in 1978 by IHC Dredgers with yard number 1108 and originally named New Amsterdam, named the Vlaanderen XI in 1986, renamed again in 2007 to Kaveri and again to Huta 15 in 2014.
253-21.jpg
253-2120 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggon CHRY 753.
253-29.jpg
253-2920 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggon CHRY 754.
255-05.jpg
255-0520 viewsSiding Three looking south across the 133.3 km grade crossing with Tamper 1 and a sleeper inserter machine stabled in the back track. Both machines are Fairmont Tamper units. Geodata location here. May 2002.
255-16.jpg
255-1620 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur curving away to the left. Geodata location here. May 2002.
255-20.jpg
255-2020 viewsWestern Creek, looking south alongside the Hamersley Iron Dampier to Tom Price line on the right with the new Robe River interconnecting line on the left as both lines pass under the Robe River Cape Lambert to Deepdale line bridge. Geodata location here. May 2002.
257-09.jpg
257-0920 viewsFlash Butt yard Mount Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW awaits its fate. Late 2021.
257-21.jpg
257-2120 viewsFlash Butt yard, compressor set #5. Modified Magor USA built ore waggons to form the compressor set, used during the unloading process. Late 2001.
257-25.jpg
257-2520 viewsGoldsworthy Junction, an empty train runs between the junction and the Broome Rd crossing behind the standard single locomotive 5646 'White Springs', a Goninan 1992 built GE CM40-8 model with serial number 5244-11 / 92-135. The four styles of waggon in use are visible, behind the loco are three Golynx waggons, then a number of Gunderson USA builds, the ribbed type is a Portec USA built and then following are the Tomlinson WA and Scotts of Ipswich built 70 ton waggons. Late 2001.
257-29.jpg
257-2920 viewsGoldsworthy Junction looking north as an empty train approaches, the line curving in from the right in the Goldsworthy or Yarrie line. The dual searchlight signal is GJ 9 and is so positioned to allow approaching trains to see the junction signal, like a repeater. Late 2001.
257-30.jpg
257-3020 viewsGoldsworthy Junction an empty train thunders through the junction behind 6000 horsepower behemoth 6072 'Hesta' serial number 51064 and built by General Electric in Erie USA in 1999 and a new built CM39-8 unit 5632 'Poseidon' by Goninan with serial number 5831-11 / 88-081. Late 2001.
190129_4247.jpg
190129 424720 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00029 built by CSR Yangtze Co China serial 2014/382-29 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190129_4252.jpg
190129 425220 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00361 built by CSR Yangtze Co China serial 2014/382-361 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190129_4256.jpg
190129 425620 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00357 built by CSR Yangtze Co China serial 2014/382-357 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190129_4268.jpg
190129 426820 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00184 built by CSR Yangtze Co China serial 2014/382-184 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190129_4281.jpg
190129 428120 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00098 built by CSR Yangtze Co China serial 2014/382-98 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190129_4293.jpg
190129 429320 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00268 built by CSR Yangtze Co China serial 2014/382-268 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
16478 files on 824 page(s) 785

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional