Most viewed |

240328 3120309 viewsHampton Ballast Siding, Watco's 5WS4 loaded acid transfer train with 57' DQHY type flat waggon built by CRRC, China in 2022 as a batch of sixty for Watco to carry the CSA acid tanks, DQHY 13023 with CSA-0127 acid tank. March 28, 2024.
|
|

250501 0305309 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2039 - GA 2040, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0322309 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2935 - GA 2936, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0380309 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2261 - GA 2262, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

100731 03077308 viewsWO type iron ore waggon WO 31219 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 114 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, empty train arriving at Binduli Triangle, 31st July 2010. This unit was converted to WOS superphosphate in the late 1980s till 1994 when it was re-classed back to WO.
|
|

100731 03078308 viewsWO type iron ore waggon WO 31212 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 108 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, empty train arriving at Binduli Triangle, 31st July 2010. This unit was converted to WOS superphosphate in the late 1980s till 1994 when it was re-classed back to WO.
|
|

100822 5867308 viewsWOE type iron ore waggon WOE 33404 is one of a batch of one hundred and forty one built by United Group Rail WA between November 2005 and April 2006 with serial number 950142-109 and fleet number 8903 for Koolyanobbing iron ore operations, Binduli Triangle 22nd August 2010.
|
|

130703 0180308 viewsTooligie, HAN type bogie grain hopper waggon HAN 35, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130703 0187308 viewsTooligie, over view of the yard, Ascom Jumbo silo complex over rail loading hopper with four cell concrete silo complex beyond it. Geo location. 3rd July 2013.
|
|

130705 0582308 viewsLock, located at the 148.5 km and originally named Terre when opened in May 1913, later renamed to Lock in December 1921. From the left background is the Ascom silo complex (Block 5), then blocks 2, 1 and 3, the train is on the mainline with the horizontal bunker (Block 4) on the right. 5th of July 2013.
|
|

130705 0616308 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

234-35308 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View looking across the YT315.8 km grade crossing and 5658 back to the ore stockpile at the loadout. Circa 1998.
|
|

210510 1105308 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 015 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

210510 1112308 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 008 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

253-13308 viewsView of Nelson Point B Berth with the vessel China Steel Developer being loaded, China Steel Developer carries the IMO #9171424 and was completed in November 1998 by CSBC Corporation at Kaohsiung in Taiwan with yard number 688, reported as scrapped at Gadani Beach 27th May 2016.
|
|

255-15308 viewsAt the 162.2 km looking north are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. The Deepdale lone is on the left while the spur runs behind the photographer and curves away from the Deepdale line. Geodata location here. May 2002.
|
|

190129 4297308 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00313 built by CSR Yangtze Co China serial 2014/382-313 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190129 4300308 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00133 built by CSR Yangtze Co China serial 2014/382-133 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190129 4302308 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00164 built by CSR Yangtze Co China serial 2014/382-164 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190129 4311308 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00198 built by CSR Yangtze Co China serial 2014/382-198 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
| 19088 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
795 |  |
 |
 |
 |
 |
 |
 |
|