Most viewed |

187-15547 viewsMonkland, Gympie Queensland. View looking east into the lower yard, overgrown. Molasses tanks in upper yard at unloading siding. GeoData.
|
|

140517-4359547 viewsMarble Bar, Prospector Creek, tin mine, near Fishers Cairn the area was a Tailings Lease #10 (87H) - FISHERS CAIRN held by Moolyella Tin Pty. Ltd in the 1960s, then a machinery lease in the 1970s. Remains of a dry tin concentrate plant. Location Here.
|
|

198-03547 viewsWittenoom, Colonial Mine, asbestos mining remains, view of driving position, throttle and battery box of battery locomotive GEMCO Hauler serial No. 12304-05/10/65, motor H.P. 2/11, volts 80, drawbar pull (lbs.) 1250 built by George Moss Pty Ltd Leederville, WA. The wheel is the handbrake.
|
|

198-11547 viewsWittenoom Gorge, Crossing Pool.
|
|

200-17547 viewsMoorine Rock, Australian National AN class AN 6 a Clyde Engineering built EMD model JT46C serial 93-1302 and ALF class 24 on the mainline with a Perth bound freight, 22nd June 1997.
|
|

207-13547 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit view of left hand side rear steerable bogie and air intakes below radiator.
|
|

208-1-03547 viewsBassendean, Rail Heritage WA Museum, exhibit #15, Pm class Pacific 4-6-2 steam engine Pm 701, class leader of thirty five such units built by North British Locomotive Co. Introduced in 1950, the class lasted until 1971.
|
|

030409 080852547 viewsWarramboo, empty grain departs following a crew change. Rebuild unit DA 7 in Australian Southern orange and black livery leads a pair of AE Goodwin built ALCo model DL531 830 class units 872 and 871, the SACBH concrete silo and Ascom silo complexes behind it.
|
|

150522 8177547 viewsWedgefield, Sims Metal yard, Goninan WA rebuild CM40-8M unit 5663 serial 8412-08 / 94-154, this unit was rebuilt without a cab and this cab was later retrofitted, was originally AE Goodwin NSW built ALCo M636 unit 5476 serial C6087-8. Photo of the removed cab can be seen here .
|
|

WTT Nor East 1984-05-20 - reprint547 viewsWorking Time-Table North-Eastern District, 20th May 1984, Passenger Reprint Pages, complete 23 page PDF download, 3.4 MB.
|
|

WTT Nor East 1986-09-03547 viewsWorking Time-Table North-Eastern Region 3rd August 1986, complete 77 page PDF download, 13.9 MB.
|
|

15333547 viewsBassendean, an unidentified Goninan rebuild GE CM40-8M unit for BHP Iron Ore under construction. Date Feb 1994.
Jim Bisdee photo.
|
|

242-37547 viewsPort Hedland, Don Rhodes Mining Museum, preserved Mt Newman Mining Comeng NSW built ALCo M636 unit 5497 serial C6096-2, view of second person or observers side of cab. May 2002.
|
|

181-04546 viewsTrafalgar yard, loading platform and goods shed, point lever and locking bar just visible on edge of frame.
|
|

187-06546 viewsMonkland, Gympie Queensland. View looking east in the Up direction, station building and platform on the right, molasses tank waggons in the distance. GeoData.
|
|

195-20546 viewsWittenoom Gorge, view looking north along Joffre Creek, the former market garden area is in the middle, with Bolitho Rd skirting the creek.
|
|

204-12546 viewsYampire Gorge view of gorge face.
|
|

207-14546 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit, view of the left hand side cab and steerable bogie.
|
|

209-04546 viewsEast Perth Passenger Terminal, Westrail L class L 272 Clyde Engineering EMD model GT26C serial 69-621 shunts the car carrying waggons into the unloading dock off the Indian Pacific.
|
|

209-11546 viewsAshfield, looking towards Perth from the station overbridge, the dual gauge tracks and yard running between the mainline and Railway Parade on the right. The standard gauge and narrow gauge points are easy to spot.
|
|
| 19088 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
83 |  |
 |
 |
 |
 |
 |
 |
|