Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
250501_0365.jpg
250501 0365229 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2829 - GA 2830, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0366.jpg
250501 0366229 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2869 - GA 2870, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0436.jpg
250501 0436229 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2189 - GA 2190, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0450.jpg
250501 0450229 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2005 - GA 2006, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0458.jpg
250501 0458229 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2769 - GA 2770, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0542.jpg
250501 0542229 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2803 - GA 2804, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0551.jpg
250501 0551229 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2045 - GA 2046, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
210321_9037.jpg
210321 9037229 viewsBoodarie, part of a loaded FMG train, painted ore waggon pair 7687 - 8688 built by CRRC Yangtze Rolling Stock Co. of China in 2018, 8688 waggon view, it features mural painting by students of South Hedland High School and was painted in August 2018. March 21, 2021.
160409_IMG_7101.jpg
160409 IMG 7101228 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
160412_IMG_7434.jpg
160412 IMG 7434228 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
231020_8248.jpg
231020 8248228 viewsParkeston, QQYY type 40' container waggon QQYY 57724 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 001206 with Cristal decal and CRM 001734 with Cristal decal, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
240328_2823.jpg
240328 2823228 viewsWOE type iron ore waggon WOE 33549 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-089 and fleet number 9041. WOE 33549 was the first to have the United Group Rail plate. In Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
240328_2990.jpg
240328 2990228 viewsLoaded Koolyanobbing iron ore train 5041 with Mineral Resources Ltd MHPY type iron ore waggons MHPY 00362 and MHPY 00361 built by CSR Yangtze Co China with serial numbers 2014 / 382-362 and 2014 / 382-361 in 2014 as a batch of 382 pairs, these bottom discharge hopper waggons are operated in 'married' pairs. March 28, 2024.
250501_0329.jpg
250501 0329228 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2207 - GA 2208, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0350.jpg
250501 0350228 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3235 - GA 3236, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0363.jpg
250501 0363228 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3185 - GA 3186, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0385.jpg
250501 0385228 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3187 - GA 3188, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0420.jpg
250501 0420228 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2607 - GA 2608, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0621.jpg
250501 0621228 viewsThomas Yard, the second of two FMG ballast plough waggons BP 02, built in China by CSR at the Yangtze Rolling Stock Company in 2010. May 1, 2025.
250501_0622.jpg
250501 0622228 viewsThomas Yard, one of FMG's thirty five ballast waggons, BH 07, 100 tonne capacity, built in China by CSR at the Yangtze Rolling Stock Company in 2008. May 1, 2025.
19085 files on 955 page(s) 832

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional