Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
250501_0425.jpg
250501 0425158 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3565 - GA 3566, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0479.jpg
250501 0479158 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3289 - GA 3290, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0502.jpg
250501 0502158 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2335 - GA 2336, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0520.jpg
250501 0520158 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2733 - GA 2734, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
240328_3190.jpg
240328 3190157 viewsWest Kalgoorlie, Viva Energy's APTF type fuel tank waggon ATPF 574 built by WAGR Midland Workshops in 1974 for Shell, in a batch of nine, as a WJP type 80,660 litre, one compartment one dome tank waggon, with a SFL of 80,500 litres, fitted with type F InterLock couplers. Pacific National empty fuel train 5445 to Esperance. March 28, 2024.
250501_0331.jpg
250501 0331157 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2587 - GA 2588, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0354.jpg
250501 0354157 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3153 - GA 3154, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0450.jpg
250501 0450157 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2005 - GA 2006, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0492.jpg
250501 0492157 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2095 - GA 2096, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0506.jpg
250501 0506157 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3115 - GA 3116, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0529.jpg
250501 0529157 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2871 - GA 2872, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
240328_2861.jpg
240328 2861156 viewsWOE type iron ore waggon WOE 33725 is from a batch of two hundred and twenty seven built by UGL Rail WA between from 08-2011 and 02-2012 of the current style of 82.5 tonne load capacity WOE class waggons and was fleet number 7136 prior to the Aurizon yellow repainted sides and logo, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
240328_2876.jpg
240328 2876156 viewsWOE type iron ore waggon WOE 33659 is from a batch of two hundred and twenty seven built by UGL Rail WA between from 08-2011 and 02-2012 of the current style of 82.5 tonne load capacity WOE class waggons and had fleet number 7070, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
250501_0313.jpg
250501 0313156 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2505 - GA 2506, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0361.jpg
250501 0361156 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3101 - GA 3102, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0413.jpg
250501 0413156 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2873 - GA 2874, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0448.jpg
250501 0448156 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2197 - GA 2798, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0454.jpg
250501 0454156 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2617 - GA 2618, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0468.jpg
250501 0468156 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2637 - GA 2638, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0517.jpg
250501 0517156 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3449 - GA 3450, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025
18739 files on 937 page(s) 842

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional