Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images. **Note - Due to recent changes to make the gallery mobile friendly, please click the image for full size picture.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
250501_0520.jpg
250501 0520302 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2733 - GA 2734, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
284-13.jpg
284-13301 viewsNarngulu yard looking south east across the grade crossing for Rudds Gully Road with the line to Mullewa curving away to the left and the line to Dongara curving away to the right. November 9, 2004.
250501_0396.jpg
250501 0396301 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2785 - GA 2786, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0391.jpg
250501 0391300 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3295 - GA 3296, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0514.jpg
250501 0514300 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2689 - GA 2690, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0495.jpg
250501 0495299 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2481 - GA 2482, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
240328_2821.jpg
240328 2821297 viewsWOE type iron ore waggon WOE 33825 is from a batch of thirty built by UGL [United Goninan Limited] in China during November and December 2015 with serial number R0189-010 in original brown paint with Aurizon logo and fleet number 7236, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
250501_0410.jpg
250501 0410296 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2349 - GA 2350, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0507.jpg
250501 0507296 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2963 - GA 2964, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0323.jpg
250501 0323293 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3073 - GA 3074, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
081225_0554.jpg
BH 24 081225 0554287 viewsBarker Siding, one of FMG's thirty five ballast waggons, BH 24, 100 tonne capacity, built in China by CSR at the Yangtze Rolling Stock Company in 2008. December 25, 2008.
0547_170729_0197.jpg
0547 170729 0197281 viewsRobe River ore waggon 547, built by Tomlinson Steel WA, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
250501_0375.jpg
250501 0375280 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2477 - GA 2478, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
0664_060716_7192.jpg
0664 060716 7192276 viewsRobe River ore waggon 664, built by Tomlinson Steel WA, fixed coupler end handbrake side loaded view at the 71 km on the Deepdale line, Western Creek, July 16, 2006.
0243_160306_1475.jpg
0243 160306 1475274 viewsRobe River ore waggon 243, built by Nippon Sharyo Nihon, fixed coupler handbrake side loaded view at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
1145_160727_0957.jpg
1145 160727 0957272 viewsRobe River ore waggon 1145, built by Bradken Rail Qld in March 2012, rotary coupler end handbrake side empty view at Harding Siding on the Cape Lambert line, July 27, 2016.
0544_160306_1460.jpg
0544 160306 1460266 viewsRobe River ore waggon 544, built by Tomlinson Steel WA, fixed coupler handbrake side loaded view, at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
0316_160306_1326.jpg
0316 160306 1326258 viewsRobe River ore waggon 316, built by Nippon Sharyo Nihon, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
WTT_15-69_Easter_Holiday_Period_1969.pdf
WTT 15-69 Easter Holiday Period 1969251 viewsEaster Holiday Period, 1969.
Full Passenger Train Service Country & Interstate.
17th February, 1969.
148 pages, 35 MB download.
0282_170729_0216.jpg
0282 170729 0216250 viewsRobe River ore waggon 282, built by Nippon Sharyo Nihon, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
19260 files on 963 page(s) 846

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional