Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images. **Note - Due to recent changes to make the gallery mobile friendly, please click the image for full size picture.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
0702_170728_09943.jpg
0702 170728 09943295 viewsRobe River ore waggon 702, built by Tomlinson Steel WA, non-handbrake side loaded view at the 72 km, Western Creek on the Deepdale line. July 28, 2017.
0816_160306_1585.jpg
0816 160306 1585295 viewsRobe River ore waggon 816, built by Centurion Industries WA, fixed coupler non-handbrake side loaded view showing drop rib end detail, at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
0873_160306_1281.jpg
0873 160306 1281295 viewsRobe River ore waggon 873, built by Centurion Industries WA, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
0883_170729_0256.jpg
0883 170729 0256295 viewsRobe River ore waggon 883, built by Centurion Industries WA, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
0896_110602_1628.jpg
0896 110602 1628295 viewsRobe River ore waggon 896, built by Centurion Industries WA, rotary coupler end handbrake side loaded view at the 71 km, Western Creek on the Deepdale line. June 2, 2011.
1024_170513_8756.jpg
1024 170513 8756295 viewsRobe River ore waggon 1024, built by Bradken Rail Qld in January 2006, handbrake side loaded view, instrumented vehicle, Cape Lambert yard, May 13, 2017.
1027_060722_7437.jpg
1027 060722 7437295 viewsRobe River ore waggon 1027, built by Bradken Rail Qld in January 2006, handbrake side empty view at the 45.4 km just south of Harding Siding on the Cape Lambert line. July 22, 2006.
1027_141124_6831.jpg
1027 141124 6831295 viewsRobe River ore waggon 1027, built by Bradken Rail Qld in January 2006, fixed coupler handbrake side empty view at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
1033_170513_8746.jpg
1033 170513 8746295 viewsRobe River ore waggon 1033, built by Bradken Rail Qld in September 2008, rotary coupler end handbrake side loaded view, instrumented vehicle, Cape Lambert yard, May 13, 2017.
1140_160306_1268.jpg
1140 160306 1268295 viewsRobe River ore waggon 1140, built by Bradken Rail Qld in April 2012, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
1209_160306_1264.jpg
1209 160306 1264295 viewsRobe River ore waggon 1209, built by Bradken Rail Qld in May 2012, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
IC20-CB07_240619_0323.jpg
IC20-CB07 240619 0323295 viewsRobe River compressor waggon CB07 was originally IC 20 with air receiver and IC 21 with two Kaeser air compressors. These waggons were ballasted to 100 tonnes each and are modified ore waggons and used for CD2 DUMPING ONLY. Cape Lambert yard June 19, 2024.
240701_2398.jpg
240701 2398295 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31483 is a master and is bar coupled to slave waggon 36483 built by China Northen as a Q type in 12/2022. Captured on July 1, 2024.
240701_2502.jpg
240701 2502295 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31574 is a master and is bar coupled to slave waggon 36574 built by China Northen as a Q type in 11/2022. Captured on July 1, 2024.
0004_141124_6850.jpg
0004 141124 6850294 viewsRobe River ore waggon 004, built by Nippon Sharyo Nihon, fixed coupler handbrake side empty view at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
0066_170728_09940.jpg
0066 170728 09940294 viewsRobe River ore waggon 066, built by Nippon Sharyo Nihon, non-handbrake side loaded view at the 72 km, Western Creek on the Deepdale line. July 28, 2017.
0082_081209_0112.jpg
0082 081209 0112294 viewsRobe River ore waggon 082, built by Nippon Sharyo Nihon, non-handbrake side loaded view at the 7 km location just south of Cape Lambert yard. December 9, 2008.
0109_170513_8671.jpg
0109 170513 8671294 viewsRobe River ore waggon 109, built by Nippon Sharyo Nihon, rotary coupler end plate view, shows Centurion Industries style waybill holder. Cape Lambert yard, May 13, 2017.
0215_160306_1298.jpg
0215 160306 1298294 viewsRobe River ore waggon 215, built by Nippon Sharyo Nihon, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
0244_170728_09930.jpg
0244 170728 09930294 viewsRobe River ore waggon 244, built by Nippon Sharyo Nihon, non-handbrake side loaded view at the 72 km, Western Creek on the Deepdale line. July 28, 2017.
19447 files on 973 page(s) 872

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Australian flag  Valid XHTML 1.0 Transitional