Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
070414_8758.jpg
070414 8758675 viewsNelson Point Locomotive Overhaul Workshop, brand new line up of BHP Billiton Electro-Motive built SD70ACe/LC units during fitting out by EDI with 4314 serial 20058712-001. Note the bolt on lashing points for shipping, 14th April 2007.
071101_1135r.jpg
071101 1135r674 viewsRedbank Bridge, this view shows just how close an FMG General Electric built Dash 9-44CW 010 serial 58187 is to sister units of Pilbara Rail Dash 9-44CW in the way of cooling vents etc. Thursday 1st November 2007.
050110_082816r.jpg
050110 082816r671 viewsSeven Mile, just over the salt mine grade crossing, former Robe River Goninan rebuilt CM40-8M locomotives 9417 serial 6266-5/89-83 and 9420 serial 8109-3/91-119 now relegated to non mainline duties as they don't have the ICSS (in-cab signalling) fitted are seen here working a loaded bound for the East Intercourse Island dumper. Monday 10th January 2005. History of these two units 9417 was built by ALCo as C636 serial 6010-1 of November 1968 for Spokane Portland & Seattle as their #340, then to Chesapeake & Ohio as #2100, Burlington Northern #4366, purchased by Robe River and rebuilt into CM40-8M in June 1989. 9420 was built by ALCo as C630 serial 3486-4 of October 1967 for Chesapeake & Ohio as #2103, purchased by Robe River in January 1975, #9420, then rebuilt to CM40-8M in 1991 by Goninan.
080120_1581r.jpg
080120 1581r671 viewsIndee Rd grade crossing, just south of Barker Siding, Comeng WA ALCo rebuild C636R model DR 8403 'Rachel' serial WA143-2, is ex Robe River 9427 and was originally ALCo C636 serial 3499-02 of 1968 for Pennsylvania Railroad (USA) #6331, seen here on the point of a loaded ballast train. 20th January 2008.
050110_122348r.jpg
050110 122348r670 viewsMaitland Siding, an empty Mesa J bound train runs along the passing track crossing a loaded sitting on the mainline. The tank waggons behind the locos are 8001 and 8002 both built in 1972 with a 45,000 litre capacity and 8003 built in 1979 with a 100,000 litre capacity, all three were built by Comeng NSW. Monday 10th January 2005.
150131_7690.jpg
150131 7690670 viewsPort Hedland, Wilson Street, view of Roy Hill's General Electric built ES44ACi unit RHA 1014 serial 62586 still under tarp during delivery 31st January 2015.
141027_5859.jpg
141027 5859668 viewsWedgefield, Sell and Parker's metal recycling yard, view of EMD SD40R unit 3095 serial 33677/7083-7 watching a former sister unit being reduced to bits, a primer mover 645 EMD engine and fuel tank tipped on its side, pilot and bogie, and the excavator with the hydraulic shears.
171204_1015r.jpg
171204 1015r667 viewsBoodarie, BHP over bridge, CFCLA's Goninan ALCo to GE rebuild CM40-8M locomotive CD 4301 serial 2160-03 / 96-202, was originally Mt Newman Mining's Comeng NSW built ALCo M636 serial C6104-1 #5500, then Robe River unit 9410 before going to CFCLA in 2012. Be being delivered to Roy Hill's flash butt yard by Doolan's Heavy Haulage. 4th December 2017. View map here.
061209_8249r.jpg
061209 8249r667 viewsSeven Mile 38 Road, former Robe River AE Goodwin built ALCo M636 unit 9412 serial G6060-3 from December 1971, originally numbered 262.003 during construction, then 1712 and finally 9412 awaits a new owner. 9th of December 2006.
141027_5853.jpg
141027 5853665 viewsWedgefield, Sell and Parker's metal recycling yard, view of and EMD SD40R unit primer mover 645 EMD engine and fuel tank tipped on its side, pilot and bogie.
050108_142945r.jpg
050108 142945r663 viewsCape Lambert, Hamersley Iron owned Pilbara Iron General Electric built Dash 9-44CW unit 7061 serial 54768 leads Robe owned Pilbara Rail 9402 serial 53456 and Hamersley Iron 7085 serial 47764 with a loaded train from the Deepdale mine past signal OB1 on the line to Cape Lambert. The switch for the quarry triangle is just in front of the train. Saturday 8th January 2005.
116-05.jpg
116-05659 viewsSpencer Street Station, view looking east from flyover, platform No.2 below with standard gauge car dock, South End Signal Box visible on Platform No's 3 and 4, V/Line N sets, A and N class locos, Crown Casino in the background behind the Spencer Street V/Line head office building, platform No.1 at far left.
141027_5860.jpg
141027 5860658 viewsWedgefield, Sell and Parker's metal recycling yard, view of EMD SD40R unit 3095 serial 33677/7083-7 watching a former sister unit being reduced to bits, fuel tank tipped on its side, pilot and bogie.
150412_7911.jpg
150412 7911656 viewsBoodarie, Roy Hill rotary tip 70m³ capacity waggons stored on the ground adjacent to their Flash Butt facility. 12th April 2015. View map here.
090121_0986r.jpg
090121 0986r653 viewsBoodarie Workshop BHP Billiton EMD built SD70ACe/LC (first order) 4302 'Mooka' serial 20038540-002 and built by Electro-Motive in London Ontario watches on with Goninan GE rebuild CM40-8M 5656 as units from the forth order of SD70ACe/LC units get commissioned by EDI personal. Units in view are (L to R) 4337, 4338, 4335, 4340, 4346 and 4339 21st January 2009.
070501_9014r.jpg
070501 9014r653 viewsWedgefield, radiator section showing ownership details of Coote Industrial ALCo rebuild unit DR 8402 'Margaret' originally Hamersley Iron #3007 an AE Goodwin built ALCo C636 serial G6011-2, rebuilt by Comeng WA 1985 to C636R serial WA135 / C6011-02, then rebuilt by GTSA with an Alco 251F engine for the construction of the FMG line. 1st May 2007.
040817_194500r.jpg
040817 194500r651 viewsNelson Point, BHP Billiton Goninan GE CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 class leader of a batch of four new built units, 5630 ended up travelling 4,940,000 km when retired. Here it idles away next to TSB 2 building awaiting a path out of Nelson Point yard with the 'Recycle Rake' bound for the dumper at Finucane Island 1945 hrs 17th August 2004.
070823_0325r.jpg
070823 0325r650 viewsBing Siding, The David and Goliath of BHP Billiton's' motive power roster in the guise of GE AC6000 unit 6073 'Fortescue' serial 51065 and EMD SD40R unit 3089 serial 31512 originally Southern Pacific SD40 SP 8431 stand on the passing track waiting a run south to the mines 23rd August 2007.
080116_1372r.jpg
080116 1372r647 viewsChapman Siding, FMG 'control' ore waggon 2396 tare 22.9 tonnes with bar coupling for the 'married' pair showing the train pipe, waggon control pipe and electrical jumper. Built by the Zhuzhou Rolling Stock Works in China, stands on the passing track. 16th January 2008.
080525_2325r.jpg
080525 2325r647 viewsBoodarie, Great Northern Highway grade crossing sees FMG General Electric built Dash 9-44CW locomotive 010 serial 58187 leading sisters 012 serial 58189 and 003 serial 58180 with an empty train heading for Cloud Break mine. The very top of the failed BHP Billiton HBI plant can be seen over the fourth and fifth ore waggons. 25th May 2008.
16099 files on 805 page(s) 9

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional