Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
240701_2392.jpg
240701 2392108 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31669 is a master and is bar coupled to slave waggon 36669 built by China Northen as a Q type in 11/2022. Captured on July 1, 2024.
240701_2396.jpg
240701 2396108 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31600 is a master and is bar coupled to slave waggon 36600 built by China Northen as a Q type in 11/2022. Captured on July 1, 2024.
240701_2398.jpg
240701 2398108 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31483 is a master and is bar coupled to slave waggon 36483 built by China Northen as a Q type in 12/2022. Captured on July 1, 2024.
240701_2471.jpg
240701 2471108 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31535 is a master and is bar coupled to slave waggon 36535 built by China Northen as a Q type in 12/2022. Captured on July 1, 2024.
240701_2477.jpg
240701 2477108 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31572 is a master and is bar coupled to slave waggon 36572 built by China Northen as a Q type in 12/2022. Captured on July 1, 2024.
100601_8392.jpg
100601 8392107 viewsWest Kalgoorlie, crew accommodation coach RZEY 3, built by South Australian Railways Islington Workshops in 1956 as Tolkini for The Overland, renamed to Malkari in 1957 then coded JTA 3 in 1987, converted to crew coach in 2007 by Bluebird Rail Operations.
100602_8720.jpg
100602 8720107 viewsParkeston, Pacific National RZAY type crew accommodation car RZAY 940 was built by Comeng NSW as an ARJ type stainless steel air conditioned first class roomette sleeping car ARJ 240 in 1968, allocated to the Indian Pacific Joint Stock in 1970, renumbered to ARJ 940 in 1974 and sold to National Rail and converted to crew car in 1997.
100605_9187.jpg
100605 9187107 viewsParkeston, SCT crew accommodation coach PSDS type PSDS 02280 'Peterborough Boys' converted by Gemco WA in 2008 from former Comeng NSW built SDS class sitting car SDS 2280 for the NSWGR.
100606_9485.jpg
100606 9485107 viewsParkeston, SCT PDAY type crew accommodation car PDAY 001 'Robert Mervin Yates', built by SAR Islington Workshops as a 250 type Bluebird second class railcar number 253 and named 'Pelican' in 1955, written off in 1995 and sold and eventually converted to a crew car by Bluebird Rail Services in 2005.
100611_0526.jpg
100611 0526107 viewsMidland, Pacific National RZBY type crew accommodation car RZBY 208 on train 4PM6, built by Comeng NSW as ER type stainless steel air conditioned crew dormitory car ER 208 in 1969, sold to National Rail and converted to crew car in 1997.
0026_160306_1345.jpg
0026 160306 1345107 viewsRobe River ore waggon 026, built by Nippon Sharyo Nihon, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
0428_170729_0195.jpg
0428 170729 0195107 viewsRobe River ore waggon 428, built by Tomlinson Steel WA, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
0565_141124_6839.jpg
0565 141124 6839107 viewsRobe River ore waggon 565, built by Tomlinson Steel WA, fixed coupler handbrake side empty view at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
0601_060722_7443.jpg
0601 060722 7443107 viewsRobe River ore waggon 601, built by Tomlinson Steel WA, handbrake side empty view at the 45.4 km just south of Harding Siding on the Cape Lambert line. July 22, 2006.
0616_160306_1237.jpg
0616 160306 1237107 viewsRobe River ore waggon 616, built by Tomlinson Steel WA, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
0830_141124_6820.jpg
0830 141124 6820107 viewsRobe River ore waggon 830, built by Centurion Industries WA, fixed coupler handbrake side empty view at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
1020_061209_8186.jpg
1020 061209 8186107 viewsRobe River ore waggon 1020, built by Bradken Rail Qld in January 2006, non-handbrake side loaded view at the 7 km location just south of Cape Lambert yard. December 9, 2006.
1042_160306_1271.jpg
1042 160306 1271107 viewsRobe River ore waggon 1042, built by Bradken Rail Qld in March 2012, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
0127_210322_9686.jpg
0127 210322 9686107 viewsRobe River ore waggon 127, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
0542_210322_9394.jpg
0542 210322 9394107 viewsRobe River ore waggon 542, built by Tomlinson Steel WA, fixed coupler non-handbrake side loaded view at Cape Lambert yard, March 22, 2021.
19088 files on 955 page(s) 942

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional