Most viewed |

07851-08852 200616 6672244 viewsFMG 7851 and 8852 on an empty train at Boodarie, June 16, 2020. 148 waggons numbered from 7851 slave and 8852 control, up to 7997 slave and 8998 control built by CRRC Yangtze between 2018 and 2020 with the ribbed body style.
|
|

0033 110602 1738243 viewsRobe River ore waggon 033, built by Nippon Sharyo Nihon, rotary coupler end handbrake side loaded view at the 71 km, Western Creek on the Deepdale line. June 2, 2011.
|
|

0589 170513 8754243 viewsRobe River ore waggon 589, built by Tomlinson Steel WA, handbrake side loaded view, Cape Lambert yard, May 13, 2017.
|
|

0600 060722 7591243 viewsRobe River ore waggon 600, built by Tomlinson Steel WA, rotary coupler end handbrake side empty view, at the 11.7 km, Cape Lambert. July 22, 2006.
|
|

0614 160306 1272243 viewsRobe River ore waggon 614, built by Tomlinson Steel WA, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
|
|

0652 170513 8632243 viewsRobe River ore waggon 652, built by Tomlinson Steel WA, rotary coupler end handbrake side loaded view, Cape Lambert yard, May 13, 2017.
|
|

0674 170513 8626243 viewsRobe River ore waggon 674, built by Tomlinson Steel WA, rotary coupler end handbrake side loaded view, Cape Lambert yard, May 13, 2017.
|
|

0704 110602 1636243 viewsRobe River ore waggon 704, built by Tomlinson Steel WA, rotary coupler end handbrake side loaded view at the 71 km, Western Creek on the Deepdale line. June 2, 2011.
|
|

0745 141124 6801243 viewsRobe River ore waggon 745, built by Tomlinson Steel WA, fixed coupler handbrake side empty view, stencil says TEST 4, at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
|
|

0782 160306 1324243 viewsRobe River ore waggon 782, built by Centurion Industries WA, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
|
|

0490 210322 9779243 viewsRobe River ore waggon 490, built by Tomlinson Steel WA, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
|
|

0511 210322 9741243 viewsRobe River ore waggon 511, built by Tomlinson Steel WA, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
|
|

0703 210322 9769243 viewsRobe River ore waggon 703, built by Tomlinson Steel WA, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
|
|

240619 0365243 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31551 is a master and is bar coupled to slave waggon 36551 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
|
|

240619 0372243 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31642 is a master and is bar coupled to slave waggon 36642 built by China Northen as a Q type in 11/2022. Captured on June 19, 2024.
|
|

100601 8391242 viewsWest Kalgoorlie, crew accommodation coach RZEY 3, built by South Australian Railways Islington Workshops in 1956 as Tolkini for The Overland, renamed to Malkari in 1957 then coded JTA 3 in 1987, converted to crew coach in 2007 by Bluebird Rail Operations.
|
|

100605 9067242 viewsParkeston, Pacific National BRS type crew accommodation coach BRS 225, originally built by Victorian Railways Newport Workshops in November 1937 as a rivetted second class sitting car for the Spirit of Progress, in August 1939 coded to BS type BS 4, in July 1977 converted to a mini buffet and coded MRS 1 and then in October 1983 recoded to BRS 225. Painted in V/Line livery in 1992. Ended up with West Coast Railway in the late 1990s, painted in WCR livery Sept 2001, prior to Pacific National ownership and conversion to a crew car.
|
|

100606 9594242 viewsGolden Ridge, CFCLA leased crew accommodation coach CDBY type CDBY 255 'Curlew', originally built by SAR Islington Workshops in 1956 as a Bluebird railcar 'Curlew', later numbered 802 in National Rail service, then to CDBY 255 when converted to crew coach in 2007.
|
|

0185 170729 0204242 viewsRobe River ore waggon 185, built by Nippon Sharyo Nihon, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
|
|

0503 170728 09911242 viewsRobe River ore waggon 503, built by Tomlinson Steel WA, non-handbrake side loaded view at the 72 km, Western Creek on the Deepdale line. July 28, 2017.
|
|
| 19447 files on 973 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
949 |  |
 |
 |
 |
 |
 |
 |
|