Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images. **Note - Due to recent changes to make the gallery mobile friendly, please click the image for full size picture.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
0656_160727_0960.jpg
0656 160727 0960240 viewsRobe River ore waggon 656, built by Tomlinson Steel WA, rotary coupler end handbrake side empty view at Harding Siding on the Cape Lambert line, July 27, 2016.
0698_110602_1730.jpg
0698 110602 1730240 viewsRobe River ore waggon 698, built by Tomlinson Steel WA, rotary coupler end handbrake side loaded view at the 71 km, Western Creek on the Deepdale line. June 2, 2011.
0737_141124_6800.jpg
0737 141124 6800240 viewsRobe River ore waggon 737, built by Tomlinson Steel WA, fixed coupler handbrake side empty view at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
0765_070909_0669.jpg
0765 070909 0669240 viewsRobe River ore waggon 765, built by Centurion Industries WA, fixed coupler handbrake side upside down on flat waggon 5003, Cape Lambert. July 22, 2006.
0883_160306_1636.jpg
0883 160306 1636240 viewsRobe River ore waggon 883, built by Centurion Industries WA, fixed coupler non-handbrake side loaded view, at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
1025_060722_7439.jpg
1025 060722 7439240 viewsRobe River ore waggon 1025, built by Bradken Rail Qld in January 2006, handbrake side empty view at the 45.4 km just south of Harding Siding on the Cape Lambert line. July 22, 2006.
0817_180616_1678.jpg
0817 180616 1678240 viewsRobe River ore waggon 817, built by Centurion Industries WA, rotary coupler end non-handbrake side loaded view with the pulled fixed coupler from 425 and its fixed coupler end at the 33.7 km, Arches on the Cape Lambert line, June 16, 2018.
100601_8386.jpg
100601 8386239 viewsWest Kalgoorlie, crew accommodation coach RZEY 3, handbrake end detail and number board view, built by South Australian Railways Islington Workshops in 1956 as Tolkini for The Overland, renamed to Malkari in 1957 then coded JTA 3 in 1987, converted to crew coach in 2007 by Bluebird Rail Operations.
0449_141124_6788.jpg
0449 141124 6788239 viewsRobe River ore waggon 449, built by Tomlinson Steel WA, fixed coupler handbrake side empty view at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
0520_060722_7587.jpg
0520 060722 7587239 viewsRobe River ore waggon 520, built by Tomlinson Steel WA, rotary coupler end handbrake side empty view, at the 11.7 km, Cape Lambert. July 22, 2006.
0599_170513_8769.jpg
0599 170513 8769239 viewsRobe River ore waggon 599, built by Tomlinson Steel WA, handbrake side loaded view, Cape Lambert yard, May 13, 2017.
0626_170728_09925.jpg
0626 170728 09925239 viewsRobe River ore waggon 626, built by Tomlinson Steel WA, non-handbrake side loaded view at the 72 km, Western Creek on the Deepdale line. July 28, 2017.
0646_160306_1638.jpg
0646 160306 1638239 viewsRobe River ore waggon 646, built by Tomlinson Steel WA, fixed coupler non-handbrake side loaded view, at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
0655_141124_6802.jpg
0655 141124 6802239 viewsRobe River ore waggon 655, built by Tomlinson Steel WA, fixed coupler handbrake side empty view at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
1042_160306_1271.jpg
1042 160306 1271239 viewsRobe River ore waggon 1042, built by Bradken Rail Qld in March 2012, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
0051_210322_9785.jpg
0051 210322 9785239 viewsRobe River ore waggon 051, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
0453_180616_1703.jpg
0453 180616 1703239 viewsRobe River ore waggon 453, built by Tomlinson Steel WA, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
240619_0368.jpg
240619 0368239 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31554 is a master and is bar coupled to slave waggon 36554 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
240619_0410.jpg
240619 0410239 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31651 is a master and is bar coupled to slave waggon 36651 built by China Northen as a Q type in 11/2022. Captured on June 19, 2024.
9105-10106_210321_9189.jpg
09105-10106 210321 9189239 viewsFMG 9105 and 10106 at Indee on an empty train March 21, 2021. 200 waggons numbered from 9105 slave and 10106 control, up to 9303 slave and 10304 control built by CRRC Qiqihar in 2020 and 2021 with the CNR style body at 22.5 tonne tare.
19447 files on 973 page(s) 951

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Australian flag  Valid XHTML 1.0 Transitional