Most viewed |

1820-6825 050828 531195 viewsLyre Siding, empty Hamersley Iron Bradken built S series waggon pair 6825 slave and 1810 control built in March 2003. August 28, 2005.
|
|

7571 050828 530995 viewsLyre Siding, empty Hamersley Iron Bradken built S series waggon bogie under slave waggon 7571 with a cast date of February 2005. Brenco 'K' class bearings AAR28 and 6 1/2 x 9 sizing. August 28, 2005.
|
|

1983 Goninan 110414 015193 viewsBoodarie, empty BHP Iron Ore Waggon 1983, a Goninan WA replacement 3Cr12 body, has original Comeng build undergear. April 14, 2011.
|
|

2204 Goninan 040802 08072993 viewsNelson Point, loaded BHP ore waggon 2204, a Goninan replacement Golynx body style from 3Cr12 stainless steel from a 2001-02 build of 345 replacement bodies for scrapped Comeng builds, with yellow bogies. August 2, 2004.
|
|

275-2093 viewsFinucane Island, BHP Iron Ore's CM40-8 locomotive 5646 'White Springs' arrives at the island across the -0.8 km grade crossing and the No. 6 switch where the balloon loops rejoins the mainline. The elevated conveyor is for the HBI plant. August 10, 2003.
|
|

4938 UG 040815 17042892 viewsNelson Point, loaded BHP Iron Ore waggon 4938 hand brake end view, a United Goninan Golynx build from February 2004. 4938 is in the third rake order with serial number 950119-099. August 15, 2004.
|
|

6663 050110 16291892 viewsDugite Siding, Robe River empty Bradken built S series slave waggon 6663 with a build date of December 2001. January 10, 2005.
|
|

275-0892 viewsBoodarie, BHP Iron Ore's 5645 'Sherlock' departs the service road on its way to Yarrie with an empty. The loaded is running down the mainline towards Finucane Island. This scene has changed immensely since August 10, 2003.
|
|

275-2392 viewsFinucane Island, BHP Iron Ore's CM40-8 locomotive 5646 'White Springs' arrives at the island. The elevated conveyor is for the HBI plant. August 10, 2003.
|
|

2208 Comeng 110414 012191 viewsBoodarie, loaded BHP Iron Ore waggon 2208, an original Comeng build from the second batch in 1970, looks to have been resheeted. April 14, 2011.
|
|

4839 UG 041001 15342090 viewsRedbank, loaded BHP Iron Ore waggon 4839, a United Goninan build part of the second rake ordering strategy of ordering 120 waggon rakes at a time. 4839 is the final waggon of the second rake with serial number 950115-120. October 1, 2004.
|
|

BH022 050828 539590 viewsRosella Siding, loaded Hamersley Iron ballast hopper waggon BH 022, built by Nippon Sharyo Japan, original MKMM still visible on the side. August 28, 2005.
|
|

1273 Comeng 110414 014989 viewsBoodarie, empty BHP Iron Ore waggon 1273, a Comeng WA original build from 1973 that has been resheeted with 3Cr12 steel to Goninan style with rounded floor. April 14, 2011.
|
|

2513 Comeng 040815 17004489 viewsBHP Iron Ore waggon 2513 builders plate, a Comeng WA build from the third batch built in 1970. August 15, 2004.
|
|

1768-6753 050828 504789 viewsTunkawanna, loaded Robe River Bradken built S series waggon pair 1768 control and 6753 slave built in March 2002. August 28, 2005.
|
|

1995-6997 050828 530789 viewsLyre Siding, empty Hamersley Iron Bradken built S series waggon pair 6997 slave and 1995 control built in July 2003. August 28, 2005.
|
|

1317 Comeng 040815 16594888 viewsBHP Iron Ore waggon 1317, builders plate, a Comeng WA build from batch of 226 built between 1973-74. August 15, 2004.
|
|

275-2288 viewsFinucane Island, BHP Iron Ore's CM40-8 locomotive 5646 'White Springs' arrives at the island across the -0.8 km grade crossing and the No. 6 switch where the balloon loops rejoins the mainline. The elevated conveyor is for the HBI plant. August 10, 2003.
|
|

160530 916287 viewsParkeston, SCT train 7GP1 which operates from Parkes NSW (Goobang Junction) to Perth prepares to depart the mainline behind SCT class SCT 013 serial 08-1737 an EDI Downer built EMD model GT46C-ACe and sister loco SCT 001 with 71 waggons for 5275 tonnes and 1679 metres, as opposing train 1PM9 runs in clear on the loop. May 30, 2016.
|
|

160530 916387 viewsParkeston, SCT train 7GP1 which operates from Parkes NSW (Goobang Junction) to Perth prepares to depart the mainline behind SCT class SCT 013 serial 08-1737 an EDI Downer built EMD model GT46C-ACe and sister loco SCT 001 with 71 waggons for 5275 tonnes and 1679 metres, as opposing train 1PM9 runs in clear on the loop. May 30, 2016.
|
|
| 19447 files on 973 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
969 |  |
 |
 |
|