Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Western Australian Negative and Digital Albums

Most viewed - Western Australian Negative and Digital Albums
160412_IMG_7363.jpg
160412 IMG 7363244 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
160412_IMG_7374.jpg
160412 IMG 7374244 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
160412_IMG_7418.jpg
160412 IMG 7418244 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
231020_8290.jpg
231020 8290244 viewsBinduli, 5029 Malcolm Freighter, AQWY type container waggon AQWY 31004, one of eighteen WFA type container waggons built by Westrail Midland Workshops in 1981, carrying a 20' ISO DE 2075 tank container DWAU 000190, a 20' 22G1 for Mediterranean Shipping Co WSCU 330481 and a 20' ISO BE 2075 tank container DWAU 000042. Both the tanks are carrying hydrogen peroxide.
240328_2865.jpg
240328 2865244 viewsWOE type iron ore waggon WOE 33383 is one of a batch of one hundred and forty one built by United Group Rail WA between November 2005 and April 2006 with serial number 950142-088 and fleet number 882, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
240328_2974.jpg
240328 2974244 viewsLoaded Koolyanobbing iron ore train 5041 with Mineral Resources Ltd MHPY type iron ore waggons MHPY 00347 and MHPY 00348 built by CSR Yangtze Co China with serial numbers 2014 / 382-347 and 2014 / 382-348 in 2014 as a batch of 382 pairs, these bottom discharge hopper waggons are operated in 'married' pairs. March 28, 2024.
240328_3034.jpg
240328 3034244 viewsLoaded Koolyanobbing iron ore train 5041 with Mineral Resources Ltd MHPY type iron ore waggons MHPY 00334 and MHPY 00333 built by CSR Yangtze Co China with serial numbers 2014 / 382-334 and 2014 / 382-333 in 2014 as a batch of 382 pairs, these bottom discharge hopper waggons are operated in 'married' pairs. March 28, 2024.
240328_3109.jpg
240328 3109244 viewsHampton Ballast Siding, Watco's 5WS4 loaded acid transfer train with 57' DQHY type flat waggon built by CRRC, China in 2022 as a batch of sixty for Watco to carry the CSA acid tanks, DQHY 13015 with CSA-0129 acid tank. March 28, 2024.
100731_03067.jpg
100731 03067243 viewsWOC type iron ore waggon WOC 31361 is one of a batch of thirty built by Goninan WA between October 1997 to January 1998 with fleet number 421 and build date of 12/1997, for Koolyanobbing iron ore operations with a 75 ton capacity and lettered for KIPL, Koolyanobbing Iron Pty Ltd with the I and P painted out, empty train arriving at Binduli Triangle, 31st July 2010.
190129_4291.jpg
190129 4291243 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00138 built by CSR Yangtze Co China serial 2014/382-138 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190129_4295.jpg
190129 4295243 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00196 built by CSR Yangtze Co China serial 2014/382-196 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190129_4304.jpg
190129 4304243 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00293 built by CSR Yangtze Co China serial 2014/382-293 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190129_4328.jpg
190129 4328243 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00303 built by CSR Yangtze Co China serial 2014/382-303 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
150326_IMG_4338.jpg
150326 IMG 4338243 viewsWest Kalgoorlie, AZAY type waste oil waggon AZAY 23439, detail image, this waggon usually operates between Merredin Loco and Forrestfield, not normally seen here in the Goldfields. Peter Donaghy image.
190107_0683.jpg
190107 0683243 viewsKalgoorlie, WN type pneumatic discharge nickel concentrate waggon WN 526, one of thirty built by AE Goodwin NSW as WN type in 1970 for WMC.
190108_1309.jpg
190108 1309243 viewsWest Kalgoorlie, ATKY 541 fuel tank waggon originally built for H C Sleigh (Golden Fleece) in 1975 by Tulloch Ltd NSW as WJK type. Capacity now of 73,000 litres in service with Caltex. Handbrake end.
160409_IMG_7051.jpg
160409 IMG 7051243 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
160409_IMG_7158.jpg
160409 IMG 7158243 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
160409_IMG_7214.jpg
160409 IMG 7214243 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
160409_IMG_7220.jpg
160409 IMG 7220243 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
4833 files on 242 page(s) 211

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional