Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > pr_website

Top rated - pr_website
050625_3840.jpg
050625 3840312 viewsGoldsworthy Junction, BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading runs off the Goldsworthy or GML line past signal GJ 2 onto the Newman mainline with the Sundowner on its return to Hedland 25th June 2005.44444
(1 votes)
050625_3834.jpg
050625 3834308 viewsPippingarra near the 31 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner along the main on its return to Hedland 25th June 2005.44444
(1 votes)
050625_3829.jpg
050625 3829272 viewsNode #2 at the 38 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner along the main on its return to Hedland 25th June 2005.44444
(1 votes)
050625_3801.jpg
050625 3801243 viewsAllan Siding at the 46 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner along the main as it crosses 5630 'Zeus' on an empty train refuged in the passing track while returning to Hedland 25th June 2005.44444
(1 votes)
050625_3797.jpg
050625 3797241 viewsAllan Siding at the 46 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner along the main on its return to Hedland 25th June 2005.44444
(1 votes)
050625_3788.jpg
050625 3788250 viewsTabba Tabba Creek bridge at the 48 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner on its return to Hedland 25th June 2005.44444
(1 votes)
050625_3784.jpg
050625 3784237 viewsAllan Siding, at the 51 km just east of Node 3 on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner waiting for an empty train to pull in clear into the siding on its way back to Hedland 25th June 2005.44444
(1 votes)
050625_3779.jpg
050625 3779227 viewsDe Grey at the 54 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner on its way back to Hedland 25th June 2005.44444
(1 votes)
050624_3371.jpg
050624 3371270 viewsGoldsworthy Siding 110.8 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leading long end on a loaded Yarrie ore train assisting CM40-8 5646 past the Sundowner set up for the Black Rock Stakes 24th June 2005.44444
(1 votes)
060414_3465r.jpg
060414 3465r390 viewsNelson Point, BHP Billiton yard pilot locos EMD SD40 3080 serial 33674 frame 7083-4 originally Southern Pacific SD40 SP 8482 and only 3000 hp shares the yard with GE AC6000 6076 'Mt Goldsworthy' serial 51068 and at 6000 hp is double 3080's size, between shunts 15th April 2006.44444
(1 votes)
040809_162852r.jpg
040809 162852r293 viewsNelson Point, BHP GE AC6000 6075 'Newman' serial 51067 and EMD SD40R 3090 serial 33680 originally Southern Pacific SD40 SP 8488 depart the yard with the 1630 hrs departure on 9th August 2004. The mid-train units 5660 and 5656 can be just seen in picture.44444
(1 votes)
5835_001_Welshpool_1987July.jpg
5835 001 Welshpool 1987July670 viewsWelshpool, Goninan rebuilt GE C36-7M unit 5509 'Chichester' serial 4839-05 / 87-074 rebuilt using Mt Newman Mining AE Goodwin ALCo C636 5452 serial G6012-1, on a Bell road float in July 1987.
Jim Bisdee photo.
44444
(1 votes)
151231_9740r.jpg
151231 9740r536 viewsGreat Northern Highway 18.2 km grade crossing, Roy Hill's General Electric built ES44ACi loco RHA 1016 serial 63827 being delivered by ALE as it crosses the Roy Hill railways grade crossing. 31st December 2015. View map here.44444
(3 votes)
080525_2416r.jpg
080525 2416r403 viewsBoodarie, as the sun glints off FMG's General Electric built Dash 9-44CW combo of 009 serial 58156, 008 serial 58155 and 005 serial 58182 units power around the balloon loop and towards the 4 km to stable and wait for the dumper to unload their rake. 25th May 2008.33333
(2 votes)
170727_9632r.jpg
170727 9632r527 viewsRoy Hill ballast waggon, BA class BA 1404, one of ten built by China Southern Rail in Zhuzhou China, seen here on the BHP line flyover. 27th July 2017. View map here.33333
(1 votes)
040807_025404r.jpg
040807 025404r322 viewsNelson Point, BHP's South Yard Locomotive Prep Shed holds GE AC6000 units 6073 'Fortescue' serial 51065 and 6075 'Newman' serial 51067 with Goninan rebuild CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06/93-139 on the night shift, 7th August 2004. This facility has since been demolished.22222
(1 votes)
081225_0587r.jpg
081225 0587r633 viewsBuilders decal for FMG's General Electric built Dash 9-44CW unit 004 serial 58181. 25th December 2008.11111
(1 votes)
     
137 files on 7 page(s) 7

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Website and all images are © 1997-2022 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional