Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Top rated
150130_7611.jpg
150130 7611517 viewsPort Hedland, right hand side rear view of Roy Hill's General Electric built ES44ACi unit RHA 1010 serial 62582, this angle shows the size of the radiator wing section. 29th January, 2015.55555
(3 votes)
090912_2289r.jpg
090912 2289r906 viewsIndee, at the 48.5 km grade crossing for Indee Road, FMG General Electric built Dash 9-44CW units 003 serial 58180 and 004 serial 58181 power another loaded train from the Cloud Break mine under Proceed Authority 54 in the last rays of sunlight on the 12th September 2009.55555
(2 votes)
130818_2712r.jpg
130818 2712r740 viewsKanyirri Yard, FMG's Progress Rail Muncie built EMD SD70ACe/LCi locomotive 707 serial 20118611-007 built 2012 seen here coupled to a sister unit. 18th August 2013.55555
(2 votes)
160319_1907.jpg
160319 1907438 viewsGreat Northern Hwy, 18.2 km grade crossing, Roy Hill empty train #96 with General Electric built ES44ACi unit RHA 1006 serial 62578 leading 116 ore waggons with a mid-train unit visible then another 116 ore waggons. 16th March 2016. View map here.55555
(2 votes)
141027_5880.jpg
141027 5880880 viewsWedgefield, Sell and Parker's metal recycling yard, General Electric AC6000 units 6075 serial 51067 is nose to nose with the remains of sister unit 6071 serial 51063.55555
(2 votes)
110-11.jpg
110-11232 viewsBenalla yard overview, broad gauge V/Line S class S 302 'Edward Henty' Clyde Engineering EMD model A7 serial 57-166, B class B 64 Clyde Engineering EMD model ML2 serial ML2-5 and V/Line T class loco T 403 with serial 67-498 a Clyde Engineering Granville NSW built EMD model G18B with stabled down Wodonga goods train 9303, point indicators.55555
(2 votes)
171-22.jpg
171-2257 viewsBallarat station Platform 1, V/Line broad gauge N class N 457 'City of Mildura' Clyde Engineering EMD model JT22HC-2 serial 85-1225 departing with an Up pass, past signal Post 21B, Ballarat A Box at right of frame.55555
(2 votes)
190911_4757.jpg
190911 475720 viewsPort Hedland, Broome Rd crossing, BHP's MM 800 track recording vehicle powers south on a recording run, still wearing it's Movember 'mo' as part of a men's health campaign, the MM 800 was built by Mermec in Italy and is a ROGER 800 model, ROGER is an acronym for Rilievo Ottico Geometria Rotaia, Italian for optical rail geometry control.55555
(1 votes)
180918_0227r.jpg
180918 0227r653 viewsBoodarie, about the 23 km at Roy Hill Rail Construction Yard, brand new Roy Hill RHA class loco RHA 1026 with serial 64743 a GE Fort Worth built GE model ES44ACi in the special Breast Cancer Awareness livery undergoes commissioning prior to official handover. All five were built at General Electric's Fort Worth Texas plant. 18th September 2018.
GeoData.
55555
(1 votes)
180918_0209r.jpg
180918 0209r486 viewsBoodarie, about the 23 km at Roy Hill Rail Construction Yard, brand new Roy Hill RHA class loco RHA 1022 with serial 64739 a GE Fort Worth built GE model ES44ACi in the special Breast Cancer Awareness livery undergoes commissioning prior to official handover. All five were built at General Electric's Fort Worth Texas plant. 18th September 2018.
GeoData.
55555
(1 votes)
180918_0204r.jpg
180918 0204r545 viewsBoodarie, about the 23 km at Roy Hill Rail Construction Yard, brand new Roy Hill RHA class loco RHA 1022 with serial 64739 a GE Fort Worth built GE model ES44ACi in the special Breast Cancer Awareness livery undergoes commissioning prior to official handover. All five were built at General Electric's Fort Worth Texas plant. 18th September 2018.
GeoData.
55555
(1 votes)
040815_165706.jpg
040815 165706291 viewsNelson Point Car Dumper 3, an original Comeng built ore waggon dating from a batch of 86 built in 1980, numbered 4080 with a build date of August 1980 which has had the walls resheeted. 15th August 2004.55555
(1 votes)
090912_2277r.jpg
090912 2277r480 viewsBoodarie, at the entrance to the Herb Elliot port car dumper balloon loop the final unit of FMG's 15 General Electric built Dash 9-44CW locos 015 serial 58192 with compressor set 9003-9004 shunts from the loaded waggon line to the empty waggon line at the 4.2 km under Proceed Authority 57 to make way for the incoming loaded train. 12th September 2009.55555
(1 votes)
090912_2249r.jpg
090912 2249r443 viewsBoodarie, at the 5 km curve between the Great Northern Highway and the car dumper balloon FMG General Electric built Dash 9-44CW light engines 009 serial 58186 and class leader 001 serial 58178 return to the port under Proceed Authority 56 following refuelling at Rowley Yard. 12th September 2009.55555
(1 votes)
090814_2109r.jpg
090814 2109r359 viewsHunter Siding, the empty train takes the passing track under the power of two FMG General Electric built Dash 9-44CW units 011 serial 58188 and 010 serial 58187, while another pair of identical units 002 serial 58179 and 012 serial 58189 hold the mainline and will wait for a new PA to continue towards the port. The dust between the two trains is from the BHP access road. 14th August 2009.55555
(1 votes)
090814_2105r.jpg
090814 2105r406 viewsHunter Siding, instrumented ore waggon pair 1685 'control' and 2686 'slave' from the original order built by CSR at their Zhuzhou Rolling Stock Works in China. 14th August 2009.55555
(1 votes)
090814_2097r.jpg
090814 2097r359 viewsHunter Siding, FMG trial waggons built by CNR QRRS in China and one tonne lighter than the existing fleet. 3001 is the slave waggon with the rotary coupling and stencilled as 21.7 tonnes, 4002 is the control waggon and should be 21.9 tonnes. FMG now has a large fleet of these waggons built by CNR QRRS or Qiqihar Railway Rolling Stock Co. Ltd of China Northern, with the tare weights now at 22.6 tonnes. 14th August 2009.55555
(1 votes)
090814_2084r.jpg
090814 2084r386 viewsHunter Siding, FMG's General Electric Dash 9-44CW locomotives 002 serial 58179 and 012 serial 58189 leading 240 loaded waggons hold the mainline waiting to cross an empty train. 14th August 2009.55555
(1 votes)
090814_2080r.jpg
090814 2080r360 viewsWoodstock, FMG's General Electric built Dash 9-44CW locomotives 011 serial 58188 and 010 serial 58187 power an empty train over the flyover located on the BHP lines at Woodstock Siding on their way to the mine at Cloud Break. 14th August 2009.55555
(1 votes)
090121_1549r.jpg
090121 1549r388 viewsBoodarie, departing the Herb Elliot car dumper balloon are FMG General Electric built Dash 9-44CW units 013 serial 58190 and 006 serial 58183 with 204 empty waggons bound for the passing track at Rowley Yard to cut out and add waggons. 21st January 2009.55555
(1 votes)
224 files on 12 page(s) 1

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Website and all images are © 1997-2021 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional