Pilbara Railways Scanned and Digital Image Showcase

The entire photo collection with the Toad's Scans images scanned from negatives and slides onto today's digital images


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Top rated
150130_7611.jpg
150130 7611377 viewsPort Hedland, right hand side rear view of Roy Hill's General Electric built ES44ACi unit RHA 1010 serial 62582, this angle shows the size of the radiator wing section. 29th January, 2015.55555
(3 votes)
130818_2712r.jpg
130818 2712r557 viewsKanyirri Yard, FMG's Electro-Motive Diesel built SD70ACe/LCi locomotive 707 serial 20118611-007 built 2012 seen here coupled to a sister unit. 18th August 2013.55555
(2 votes)
141027_5880.jpg
141027 5880841 viewsWedgefield, Sell and Parker's metal recycling yard, General Electric AC6000 units 6075 serial 51067 is nose to nose with the remains of sister unit 6071 serial 51063.55555
(2 votes)
180918_0227r.jpg
180918 0227r468 viewsBoodarie, about the 23 km at Roy Hill Rail Construction Yard, brand new Roy Hill RHA class loco RHA 1026 with serial 64743 a GE Fort Worth built GE model ES44ACi in the special Breast Cancer Awareness livery undergoes commissioning prior to official handover. All five were built at General Electric's Fort Worth Texas plant. 18th September 2018.
GeoData.
55555
(1 votes)
180918_0209r.jpg
180918 0209r335 viewsBoodarie, about the 23 km at Roy Hill Rail Construction Yard, brand new Roy Hill RHA class loco RHA 1022 with serial 64739 a GE Fort Worth built GE model ES44ACi in the special Breast Cancer Awareness livery undergoes commissioning prior to official handover. All five were built at General Electric's Fort Worth Texas plant. 18th September 2018.
GeoData.
55555
(1 votes)
180918_0204r.jpg
180918 0204r382 viewsBoodarie, about the 23 km at Roy Hill Rail Construction Yard, brand new Roy Hill RHA class loco RHA 1022 with serial 64739 a GE Fort Worth built GE model ES44ACi in the special Breast Cancer Awareness livery undergoes commissioning prior to official handover. All five were built at General Electric's Fort Worth Texas plant. 18th September 2018.
GeoData.
55555
(1 votes)
090912_2289r.jpg
090912 2289r335 viewsIndee, at the 48.5 km grade crossing for Indee Road, FMG General Electric built C44-9W units 003 serial 58180 and 004 serial 58181 power another loaded train from the Cloud Break mine under Proceed Authority 54 in the last rays of sunlight on the 12th September 2009.55555
(1 votes)
090912_2277r.jpg
090912 2277r350 viewsBoodarie, at the entrance to the Herb Elliot port car dumper balloon loop the final unit of FMG's 15 General Electric built C44-9W locos 015 serial 58192 with compressor set 9003-9004 shunts from the loaded waggon line to the empty waggon line at the 4.2 km under Proceed Authority 57 to make way for the incoming loaded train. 12th September 2009.55555
(1 votes)
090912_2249r.jpg
090912 2249r306 viewsBoodarie, at the 5 km curve between the Great Northern Highway and the car dumper balloon FMG General Electric built C44-9W light engines 009 serial 58186 and class leader 001 serial 58178 return to the port under Proceed Authority 56 following refuelling at Rowley Yard. 12th September 2009.55555
(1 votes)
090814_2109r.jpg
090814 2109r257 viewsHunter Siding, the empty train takes the passing track under the power of two FMG General Electric built C44-9W units 011 serial 58188 and 010 serial 58187, while another pair of identical units 002 serial 58179 and 012 serial 58189 hold the mainline and will wait for a new PA to continue towards the port. The dust between the two trains is from the BHP access road. 14th August 2009.55555
(1 votes)
090814_2105r.jpg
090814 2105r303 viewsHunter Siding, instrumented ore waggon pair 1685 'control' and 2686 'slave' from the original order built by CSR at their Zhuzhou Rolling Stock Works in China. 14th August 2009.55555
(1 votes)
090814_2097r.jpg
090814 2097r258 viewsHunter Siding, FMG trial waggons built by CNR QRRS in China and one tonne lighter than the existing fleet. 3001 is the slave waggon with the rotary coupling and stencilled as 21.7 tonnes, 4002 is the control waggon and should be 21.9 tonnes. FMG now has a large fleet of these waggons built by CNR QRRS or Qiqihar Railway Rolling Stock Co. Ltd of China Northern, with the tare weights now at 22.6 tonnes. 14th August 2009.55555
(1 votes)
090814_2084r.jpg
090814 2084r272 viewsHunter Siding, FMG's General Electric C44-9W locomotives 002 serial 58179 and 012 serial 58189 leading 240 loaded waggons hold the mainline waiting to cross an empty train. 14th August 2009.55555
(1 votes)
090814_2080r.jpg
090814 2080r264 viewsWoodstock, FMG's General Electric built C44-9W locomotives 011 serial 58188 and 010 serial 58187 power an empty train over the flyover located on the BHP lines at Woodstock Siding on their way to the mine at Cloud Break. 14th August 2009.55555
(1 votes)
090121_1549r.jpg
090121 1549r280 viewsBoodarie, departing the Herb Elliot car dumper balloon are FMG General Electric built C44-9W units 013 serial 58190 and 006 serial 58183 with 204 empty waggons bound for the passing track at Rowley Yard to cut out and add waggons. 21st January 2009.55555
(1 votes)
080118_1412r.jpg
080118 1412r261 viewsBarker Siding, Comeng ALCo rebuild C636R model DR 8404 'Vera' serial WA135 / C6040-1 was rebuilt from Hamersley Iron 3013 an ALCo C636. Here it idles away on a ballast train during loading for the afternoon ballast run, DR 8403 is on the other end. 18th January 2008.55555
(1 votes)
061026_0359r.jpg
061026 0359r366 viewsSeven Mile, retired Robe River ALCo units in preparation to travel to Perth. Comeng WA ALCo rebuild CE636R 9426 serial WA143-1 leads the all ALCo line up. 26th October 2006.
Geoffrey Higham image.
55555
(1 votes)
130815_2574.jpg
130815 2574410 viewsBarker Siding, FMG has ten 82.4 tonne capacity air operated side dump waggons built in USA by JK-CO in 2012. SDC 09 sits at the ballast loading point. 15th August 2013.55555
(1 votes)
110619_1916.jpg
110619 1916341 viewsBarker Siding which is the ballast loading point, one of two FMG ballast plough waggons BP 01, built in China by CSR at the Yangtze Rolling Stock Company in 2010. 19th June 2011.55555
(1 votes)
141126_7252r.jpg
141126 7252r375 viewsKanga at the 105km, the final member of FMG's thirty strong fleet of tank waggons TK 30, 95,000 litre capacity built in China by CSR at the Zhuzhou Rolling Stock Works. 26th November 2014.55555
(1 votes)
201 files on 11 page(s) 1

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Website and all images are © 1997-2020 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional