Pilbara Railways Scanned and Digital Image Showcase

The entire photo collection with the Toad's Scans images scanned from negatives and slides onto today's digital images


Home Login
Album list Most viewed Top rated My Favourites Search
Top rated
050625_3840.jpg
050625 3840117 viewsGoldsworthy Junction, BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading runs off the Goldsworthy or GML line past signal GJ 2 onto the Newman mainline with the Sundowner on its return to Hedland 25th June 2005.44444
(1 votes)
050625_3834.jpg
050625 3834119 viewsPippingarra near the 31km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner along the main on its return to Hedland 25th June 2005.44444
(1 votes)
050625_3829.jpg
050625 382995 viewsNode #2 at the 38km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner along the main on its return to Hedland 25th June 2005.44444
(1 votes)
050625_3801.jpg
050625 380183 viewsAllan Siding at the 46km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner along the main as it crosses 5630 'Zeus' on an empty train refuged in the passing track while returning to Hedland 25th June 2005.44444
(1 votes)
050625_3797.jpg
050625 379778 viewsAllan Siding at the 46km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner along the main on its return to Hedland 25th June 2005.44444
(1 votes)
050625_3788.jpg
050625 378890 viewsTabba Tabba Creek bridge at the 48km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner on its return to Hedland 25th June 2005.44444
(1 votes)
050625_3784.jpg
050625 378482 viewsAllan Siding, at the 51km just east of Node 3 on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner waiting for an empty train to pull in clear into the siding on its way back to Hedland 25th June 2005.44444
(1 votes)
050625_3779.jpg
050625 377973 viewsDe Grey at the 54km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner on its way back to Hedland 25th June 2005.44444
(1 votes)
050624_3371.jpg
050624 337197 viewsGoldsworthy Siding 110.8km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leading long end on a loaded Yarrie ore train assisting CM40-8 5646 past the Sundowner set up for the Black Rock Stakes 24th June 2005.44444
(1 votes)
5499.jpg
5499337 viewsNelson Point, Mount Newman Mining Comeng NSW built ALCo M-636 model locomotive 5499 serial C-6096-4 is the last active ALCo on the roster of BHP 22nd April 2000.44444
(1 votes)
060414_3465r.jpg
060414 3465r137 viewsNelson Point, BHP Billiton yard pilot locos EMD SD40 3080 serial 33674 frame 7083-4 originally Southern Pacific SD40 SP 8482 and only 3000 hp shares the yard with GE AC6000 6076 'Mt Goldsworthy' serial 51068 and at 6000 hp is double 3080's size, between shunts 15th April 2006.44444
(1 votes)
5835_001_Welshpool_1987July.jpg
5835 001 Welshpool 1987July243 viewsWelshpool, Goninan rebuilt GE CM36-7M unit 5509 'Chichester' serial 4839-05 / 87-074 rebuilt using Mount Newman Mining AE Goodwin ALCo C636 5452 serial G-6012-1, on a Bell road float in July 1987.
Jim Bisdee photo.
44444
(1 votes)
130704_0393.jpg
130704 039327 viewsKyancutta, 44444
(1 votes)
140517-4427.jpg
140517-442783 viewsA Tutt Bryant rope operated Pacific A.C.E Equipment Wheel Loader, Fordson powered?? The front end loader which lifts the bucket over the cab to feed the trammel, or dump into a truck, see an historical picture of this unit here at the Battye Library and an image of a similar unit on the manufacturer's website44444
(1 votes)
190-07.jpg
190-0792 viewsCootamundra, NSW Main South, still looking north, another mechanical lower quadrant semaphore signal gantry.44444
(1 votes)
190-01.jpg
190-01108 viewsCootamundra, NSW Main South, looking south from the pedestrian footbridge, past loco depot, turntable visible with sanding tower.44444
(1 votes)
151231_9740r.jpg
151231 9740r171 viewsGreat Northern Highway 18.2 km grade crossing, Roy Hill's General Electric built ES44ACi loco RHA 1016 serial 63827 being delivered by ALE as it crosses the Roy Hill railways grade crossing. 31st December 2015. View map here.44444
(3 votes)
170727_9632r.jpg
170727 9632r192 viewsRoy Hill ballast waggon, BA class BA 1404, one of ten built by China Southern Rail in Zhuzhou China, seen here on the BHP line flyover. 27th July 2017. View map here.33333
(1 votes)
141025_5818.jpg
141025 58181028 viewsWedgefield, WA, view from the new bypass road looking into the rear of Sell and Parker's metal recycling yard with former BHP Billiton Iron Ore EMD SD40, SD40R and GE AC6000 model units lined up awaiting their fate, from left, EMD SD40 3080, SD40R 3097, SD40 3078, SD40R 3088, 3086, 3094, AC6000 6075, SD40R 3091, AC6000 6073 and remains of another SD40R.33333
(6 votes)
040807_025404r.jpg
040807 025404r146 viewsNelson Point, BHP's South Yard Locomotive Prep Shed holds GE AC6000 units 6073 'Fortescue' serial 51065 and 6075 'Newman' serial 51067 with Goninan rebuild CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06/93-139 on the night shift, 7th August 2004. This facility has since been demolished.22222
(1 votes)
190 files on 10 page(s) 9

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Website and all images are © 1997-2019 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional