Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - non iron ore > 0198
198-18
Port Hedland Port, view of the Cargill Salt berth and loader, or PHPA Berth No. 3, in this 2001 view, the then new bulker loader is under construction and manganese is stockpiled on the ground. The BHP Finucane Island berth is visible along with the overland conveyor for the HBI plant.

198-18

Port Hedland Port, view of the Cargill Salt berth and loader, or PHPA Berth No. 3, in this 2001 view, the then new bulker loader is under construction and manganese is stockpiled on the ground. The BHP Finucane Island berth is visible along with the overland conveyor for the HBI plant.

198-16.jpg 198-17.jpg 198-18.jpg 198-19.jpg 198-20.jpg
Rate this file (No vote yet)
File information
Filename:198-18.jpg
Album name:admin / 0198
Location:Port Hedland, WA
Filesize:212 KiB
Date added:Aug 16, 2014
Dimensions:856 x 1280 pixels
Displayed:195 times
Exposure Time:0/1 sec
FNumber:f/0
Focal length:0 mm
Make:Epson
Model:Perfection V700/V750
URL:https://pilbararailways.com.au/gallery/displayimage.php?pid=3526
Favourites:Add to Favourites
Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional