Port Hedland Port, view of the Cargill Salt berth and loader, or PHPA Berth No. 3, in this 2001 view, the then new bulker loader is under construction and manganese is stockpiled on the ground. The BHP Finucane Island berth is visible along with the overland conveyor for the HBI plant, in the far background is the admin building for BHP Transport the operator of the Tug Boats.