Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 0226
226-03
Yule River bridge showing new piles and deck to replace flood damaged piles after a cyclone that closed the line for two weeks in the late 1990s. [url=https://goo.gl/maps/G67Mat23u4P2]GeoData[/url].

226-03

Yule River bridge showing new piles and deck to replace flood damaged piles after a cyclone that closed the line for two weeks in the late 1990s. GeoData.

226-01.jpg 226-02.jpg 226-03.jpg 226-04.jpg 226-05.jpg
Rate this file (No vote yet)
File information
Filename:226-03.jpg
Album name:admin / 0226
Location:Yule River, WA
Filesize:272 KiB
Date added:Nov 13, 2015
Dimensions:1280 x 852 pixels
Displayed:85 times
Exposure Time:0/1 sec
FNumber:f/0
Focal length:0 mm
Make:Epson
Model:Perfection V700/V750
URL:https://pilbararailways.com.au/gallery/displayimage.php?pid=8817
Favourites:Add to Favourites
Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional