Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > Robe_River_Rolling_Stock
0334 170729 0228
Robe River ore waggon 334, built by Nippon Sharyo Nihon, fixed coupler handbrake side loaded view. Stencil says TEST 3 DO NOT UNCOUPLE, at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
Keywords: 334;Nippon-Sharyo-Nihon;Robe-ore-waggon;

0334 170729 0228

Robe River ore waggon 334, built by Nippon Sharyo Nihon, fixed coupler handbrake side loaded view. Stencil says TEST 3 DO NOT UNCOUPLE, at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.

0330_170729_0224.jpg 0333_060722_7531.jpg 0334_170729_0228.jpg 0335_160306_1647.jpg 0335_170728_09929.jpg
Rate this file (No vote yet)
File information
Filename:0334_170729_0228.jpg
Album name:admin / Robe_River_Rolling_Stock
Keywords:334 / Nippon-Sharyo-Nihon / Robe-ore-waggon /
Location:Fortescue River, WA
Code and Number:334
Builder / Type / Model:Nippon Sharyo Nihon
Filesize:672 KiB
Date added:Aug 16, 2025
Dimensions:1280 x 853 pixels
Displayed:1 times
DateTime Original:2017:07:29 13:09:57
Exposure Time:1/640 sec
FNumber:f/7.1
Focal length:50 mm
Make:Canon
Model:Canon EOS 5D Mark III
URL:https://pilbararailways.com.au/gallery/displayimage.php?pid=18681
Favourites:Add to Favourites
Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional