The entire photo collection of images scanned from negatives and slides and digital images. **Note - Due to recent changes to make the gallery mobile friendly, please click the image for full size picture.
Cape Lambert, a Robe River loaded Deepdale train on the mainline with waggon 700 a Tomlinson Steel WA build. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. 22nd May 2002.