Parkeston, return SCT working 1PM9 led by SCT 004 crosses opposing SCT Perth bound train 7GP1 with SCT 013 on the lead waiting on the mainline. Before SCT introduced these AC traction locomotives the original operations were powered by three of four 3000 hp DC locomotives.