Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 09-12_2017
170915 0716
At the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1002 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. [url=https://goo.gl/maps/DR61N4rDVZy]View map here[/url].
Keywords: TA-Type;TA1002;CSR-Yangtze-Rolling-Stock-Co-China;Roy-Hill-Tank-Waggon;

170915 0716

At the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1002 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.

030415_171548.jpg 030416_094308.jpg 170915_0716.jpg 242-28.jpg 180615_1575.jpg
Rate this file (No vote yet)
File information
Filename:170915_0716.jpg
Album name:admin / 09-12_2017
Keywords:TA-Type / TA1002 / CSR-Yangtze-Rolling-Stock-Co-China / Roy-Hill-Tank-Waggon /
Location:Boodarie, WA
Code and Number:TA 1002
Builder / Type / Model:CSR Yangtze Rolling Stock Co China
Filesize:466 KiB
Date added:Dec 06, 2017
Dimensions:1280 x 853 pixels
Displayed:119 times
DateTime Original:2017:09:15 12:49:56
Exposure Time:1/800 sec
FNumber:f/8
Focal length:85 mm
Make:Canon
Model:Canon EOS 5D Mark III
URL:https://pilbararailways.com.au/gallery/displayimage.php?pid=14118
Favourites:Add to Favourites
Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional