Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 0207
207-28
Hardie Siding, the days of the C36-7M or Dash 7 units running the Goldsworthy line are almost over, as the CM40-8M or Dash 8 variants take up the task following the arrival of the AC6000 class units. Here, CM40-8MEFI unit 5669 'Beilun' takes the passing track with an empty as C36-7M unit 5513 holds the mainline with a loaded.
Keywords: 5669;Goninan;GE;CM40-8EFI;8412-02/95-160;rebuild;Comeng-NSW;ALCo;M636C;5486;C6084-2;

207-28

Hardie Siding, the days of the C36-7M or Dash 7 units running the Goldsworthy line are almost over, as the CM40-8M or Dash 8 variants take up the task following the arrival of the AC6000 class units. Here, CM40-8MEFI unit 5669 'Beilun' takes the passing track with an empty as C36-7M unit 5513 holds the mainline with a loaded.

200-08.jpg 200-12.jpg 207-28.jpg 217-16.jpg 237-05.jpg
Rate this file (No vote yet)
File information
Filename:207-28.jpg
Album name:admin / 0207
Keywords:5669 / Goninan / GE / CM40-8EFI / 8412-02/95-160 / rebuild / Comeng-NSW / ALCo / M636C / 5486 / C6084-2 /
Location:Hardie Siding, WA
Code and Number:5669
Builder / Type / Model:Goninan GE CM40-8MEFI
Serial / Builder's Number:8412-02 / 95-160
Filesize:487 KiB
Date added:Oct 01, 2014
Dimensions:1280 x 853 pixels
Displayed:266 times
Exposure Time:0/1 sec
FNumber:f/0
Focal length:0 mm
Make:Epson
Model:Perfection V700/V750
URL:https://pilbararailways.com.au/gallery/displayimage.php?pid=3853
Favourites:Add to Favourites
Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional