Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 0226
226-30
Shaw siding, the loaded train heading north behind two Goninan CM40-8M GE rebuild units with loaded Comeng WA built waggons and a couple of the smooth sided experimental Comeng waggons. [url=https://goo.gl/maps/JLjSYskHScU2]GeoData[/url].

226-30

Shaw siding, the loaded train heading north behind two Goninan CM40-8M GE rebuild units with loaded Comeng WA built waggons and a couple of the smooth sided experimental Comeng waggons. GeoData.

224-32.jpg 225-29.jpg 226-30.jpg 229-20.jpg 230-25.jpg
Rate this file (No vote yet)
File information
Filename:226-30.jpg
Album name:admin / 0226
Location:Shaw Siding, WA
Filesize:264 KiB
Date added:Nov 13, 2015
Dimensions:1280 x 847 pixels
Displayed:77 times
Exposure Time:0/1 sec
FNumber:f/0
Focal length:0 mm
Make:Epson
Model:Perfection V700/V750
URL:https://pilbararailways.com.au/gallery/displayimage.php?pid=8845
Favourites:Add to Favourites
Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional