Toad's Scans and Pilbara Railways Digital Showcase

My entire photo collection starting with the Toad's Scans image collection which are scanned from negatives and slides


Home Login
Album list Most viewed Top rated My Favourites Search
Home > pr_website

040806 091254r

Goldsworthy Junction, BHP Goninan GE rebuild CM40-8MEFI 5666 'Taranto' serial 8412-11/94-157, was the first unit fitted with Electronic Fuel Injection to the 16FDL engine hence the EFI on the model designation, is in charge of the Weighbridge Calibration train which is situated in the middle of the switches at the Goldsworthy Junction. 5666 will do several trips back and forward over the weighbridge at various speed to allow the technicians to calibrate it as well as having to clear the mainline for loaded and empty train movements. 0915 hrs 6th August 2004.

040802_155602r.jpg 040803_142716r.jpg 040806_091254r.jpg 040806_185209r.jpg 040806_185922r.jpg
Rate this file (No vote yet)
File information
Filename:040806_091254r.jpg
Album name:admin / pr_website
Keywords:5666 / Goninan / GE / CM40-8MEFI / 8412-11/94-157 /
Location:Goldsworthy Junction, WA
Code and Number:5666
Builder / Type / Model:Goninan GE CM40-8MEFI
Serial / Builder's Number:8412-11/94-157
Displayed:74 times
URL:http://pilbararailways.com.au/gallery/displayimage.php?pid=14280
Favourites:Add to Favourites