Port Hedland, Wilson Street, two Kingston Mack prime movers power the 256 wheel float with the second Metso built rotary dumper cell for FMG. Seen here approaching the Redbank Bridge. Of note is these cells for FMG will clamp the top of the ore waggon, similar to the Pilbara Iron dumpers, while the BHP cells clamp down on side pockets in the waggons. Sunday 23rd September 2007.