Chapman Siding, FMG 'control' ore waggon 2396 tare 22.9 tonnes with bar coupling for the 'married' pair showing the train pipe, waggon control pipe and electrical jumper. Built by the Zhuzhou Rolling Stock Works in China, stands on the passing track. 16th January 2008.