Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Western Australian Negative and Digital Albums > 5WS4_Watco_acid_240328
240328 3102
Hampton Ballast Siding, Watco operated loaded acid transfer train 5WS4 from the smelter at Hampton to the sidings here. CQPY type 40' container waggon CQPY 1859 is one of two hundred built by Rail First  at their Islington workshops, SA in 2021-2023. In use here as a safety waggon. March 28, 2024.
Keywords: CQPY-type;CQPY1859;Rail-First-Islington-WS-SA;

240328 3102

Hampton Ballast Siding, Watco operated loaded acid transfer train 5WS4 from the smelter at Hampton to the sidings here. CQPY type 40' container waggon CQPY 1859 is one of two hundred built by Rail First at their Islington workshops, SA in 2021-2023. In use here as a safety waggon. March 28, 2024.

240328_3100.jpg 240328_3101.jpg 240328_3102.jpg 240328_3103.jpg 240328_3104.jpg
Rate this file (No vote yet)
File information
Filename:240328_3102.jpg
Album name:admin / 5WS4_Watco_acid_240328
Keywords:CQPY-type / CQPY1859 / Rail-First-Islington-WS-SA /
Location:Hampton Ballast Siding, WA
Code and Number:CQPY 1859
Builder / Type / Model:Rail First Islington Workshops SA / CQPY
Filesize:864 KiB
Date added:Mar 09, 2025
Dimensions:1280 x 853 pixels
Displayed:3 times
DateTime Original:2024:03:28 13:05:47
Exposure Time:1/640 sec
FNumber:f/7.1
Focal length:50 mm
Make:Canon
Model:Canon EOS 5D Mark III
URL:https://pilbararailways.com.au/gallery/displayimage.php?pid=17826
Favourites:Add to Favourites
Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional