| 
        
 | 
        
        
        
                
                        
                                
                                          
                                        196-01566 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C unit 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
                                        
                                 | 
                         
                 
         | 
        
                
                        
                                
                                          
                                        196-02486 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
                                        
                                 | 
                         
                 
         | 
        
                
                        
                                
                                          
                                        196-03514 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C unit 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
                                        
                                 | 
                         
                 
         | 
        
                
                        
                                
                                          
                                        196-04513 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C unit 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
                                        
                                 | 
                         
                 
         | 
        
        
        
                
                        
                                
                                          
                                        196-05552 viewsYandi Two, builders plate for BHP Goninan GE rebuild CM40-8M unit 5658 'Kakogawa' serial 8412-03 / 94-149. Originally AE Goodwin built ALCo M636C unit 5480 serial G6061-1. May 1998.
                                        
                                 | 
                         
                 
         | 
        
                
                        
                                
                                          
                                        196-06535 viewsYandi Two, BHP Iron Ore 5631 'Apollo' serial 5831-10 / 88-080 originally built new by Goninan as a GE CM39-8 in 1988. Drivers side cab view shows hand brake chain and bogie. May 1998.
                                        
                                 | 
                         
                 
         | 
        
                
                        
                                
                                          
                                        196-07505 viewsYandi Two, BHP Iron Ore 5630 'Zeus' serial 5831-09 / 88-079 originally built new by Goninan as a GE CM39-8 in 1988. Drivers side cab view shows hand brake chain and bogie. May 1998.
                                        
                                 | 
                         
                 
         | 
        
                
                        
                                
                                          
                                        196-08526 viewsYandi Two, BHP Iron Ore 5630 'Zeus' serial 5831-09 / 88-079 originally built new by Goninan as a GE CM39-8 in 1988. Drivers side cab view shows hand brake chain and bogie. May 1998.
                                        
                                 | 
                         
                 
         | 
        
        
        
                
                        
                                
                                          
                                        196-09509 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
                                        
                                 | 
                         
                 
         | 
        
                
                        
                                
                                          
                                        196-10510 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
                                        
                                 | 
                         
                 
         | 
        
                
                        
                                
                                          
                                        196-11506 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
                                        
                                 | 
                         
                 
         | 
        
                
                        
                                
                                          
                                        196-12474 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
                                        
                                 | 
                         
                 
         | 
        
        
        
                
                        
                                
                                          
                                        196-13468 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
                                        
                                 | 
                         
                 
         | 
        
                
                        
                                
                                          
                                        196-14448 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
                                        
                                 | 
                         
                 
         | 
        
                
                        
                                
                                          
                                        196-15442 viewsYandi Two loaded car side of the loadout balloon loop, loaded train departing behind BHP Iron Ore triple CM40-8M units, 5662 'Port Kembla' serial 8412-07 / 94-153 rebuilt by Goninan in 1994 from Comeng NSW built ALCo M636C #5490 serial C6084-6 from 1974, leading two similar sister units. May 1998.
                                        
                                 | 
                         
                 
         | 
        
                
                        
                                
                                          
                                        196-16494 viewsYandi Two loaded car side of the loadout balloon loop, loaded train departing behind BHP Iron Ore triple CM40-8M units, 5662 'Port Kembla' serial 8412-07 / 94-153 rebuilt by Goninan in 1994 from Comeng NSW built ALCo M636C #5490 serial C6084-6 from 1974, leading two similar sister units. May 1998.
                                        
                                 | 
                         
                 
         | 
        
        
        
                
                        
                                
                                          
                                        196-17477 viewsYandi Two loaded car side of the loadout balloon loop, loaded train departing behind BHP Iron Ore triple CM40-8M units, 5662 'Port Kembla' serial 8412-07 / 94-153 rebuilt by Goninan in 1994 from Comeng NSW built ALCo M636C number 5490 serial C6084-6 from 1974, leading two similar sister units. May 1998.
                                        
                                 | 
                         
                 
         | 
                  | 
                  | 
                  | 
        
        
                | 
                        
                 |