Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Interstate negative and digital Albums > 0210

210-20.jpg
210-20119 viewsWeipa, Lorim Point railway workshops, Canron Rail Group Mk I switch tamper. Canron was taken over by Harsco in 1990-91.
210-21.jpg
210-21108 viewsWeipa, Lorim Point railway workshops, rear view of Comalco ore waggon 3002, shows handbrake, triple valve and piping and air receivers, this is one of the compressor equipped waggons.
210-22.jpg
210-22114 viewsWeipa, Lorim Point railway workshops, side view of Comalco ore waggon 3002, shows handbrake, triple valve and piping, side piping and controls, bogies and discharge doors and air receivers, this is one of the compressor equipped waggons.
210-23.jpg
210-2393 viewsWeipa, Lorim Point railway workshops, side view of Comalco ore waggon 3002, shows handbrake, triple valve and piping, side piping and controls, bogies and discharge doors and air receivers, this is one of the compressor equipped waggons.
210-24.jpg
210-2492 viewsWeipa, Lorim Point railway workshops, view of compressor end of Comalco ore waggon 3002, shows compressor, fuel tank, controls and piping and bogie.
210-25.jpg
210-25156 viewsWeipa, Lorim Point railway workshops, overview looking east, shunt loco EMD model NW2 R 1003 and Difco side-dump on the left, Clyde Engineering EMD model GT26C R 1001 is at the fuel point. Workshop building at the right.
   
26 files on 2 page(s) 2

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional